Forum quick links
Financial support option
EBOM-v4 SSc1:Site Development- protect or restore habitatposted by Tracy Smith on
Hi, Just want to make sure I'm understanding this point correctly.
v6 Forms with Different Compliance Paths
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Michelle Rosenberger on
This prerequisite has always had 3 compliance paths - photos, inspection reports or a maintenance narrative.
Existing building demolition
Healthcare-v2009 MRc2:Construction waste managementposted by Micah Vainikka on
I work for a construction company that is building a new hospital for a client.
Raw Material Source and Extraction Reporting
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Dionisio Franca on
Hello, Tarkett, a flooring company, states that their CSR report meets LEED's sourcing of raw material option.
minimum vegetation area
CS-2009 WEc1:Water Efficient Landscapingposted by Agnieszka Rylska on
Our project has a very limmitted vegetation area on the grounds because the building footprint covers almost the whole site.There are only some small parts of vegetation covered with grass and some
VOC Content Reporting
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Mario S. on
We are working on a LEED project outside the U.S. The datasheets received for the paints and coatings state the VOC content in g/L excluding water as per ISO 11890-2:2006.
VOC - exempt compounds larger than 1%
Retail-NC-v4 EQc2:Low emitting materialsposted by Ian McCall on
Hello, The LEED guidebook, states "If the applicable regulation requires subtraction of exempt compounds, any content of intentionally added exempt compounds larger than 1% weight by mass (total e
EBOM IEQp1-A1 Statement "Would need over 100% OA Intake"
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by James Doyle on
Our EBOM 2009 project credit data has to be completed by 8-5 and I am getting a message "Would need over 100% OA Intake" at the end of the IEQp1-A1 VAV data input form.
CxA Allowed to be Hired by GC?
CI-2009 EAc2:Enhanced Commissioningposted by LUCY WILLIAMS on
Hi, Does the GBCI accept the Cx Agent for the Enhanced Commissioning credit to now be hired by the Contractor in a design-build scenario? In reading Interpretation #10244, it seems this is now all
French VOC emission labeling
NC-v4 EQc2:Low emitting materialsposted by FABIO VIERO on
Hi all Could you confirm that for General Emission Evalutation, French VOC emission labeling is accepted even if in the document http://www.usgbc.org/sites/default/files/Low%20Emitting%20Third%20Pa