Forum quick links
overall accuracy, anticipated areas of error susceptibility
NC-2009 EAc5:Measurement and Verificationposted by Leanne Niu on
There is a review comment in my project as follows: It appears that the M&V plan provided does not specify the expected overall accuracy, anticipated areas of error susceptibility, and magnitud
New materials and resources calculator since 12/01/16
NC-2009 MRc5:Regional Materialsposted by Guillermo Brunzini on
Hello Everybody, Two questions: 1- a project registered in 2012 can use the new materials and resources calculator? 2- What happens with the cutsheets required in previous versions,?
Potential crossover credit from New Construction to Schools?
Schools-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Greengrade User on
Our school is being rated under LEED for schools v2009.
Local voluntary cleanup program - definition
NC-2009 SSc3:Brownfield Redevelopmentposted by Anna Korinkova on
Under Option 1 of the credit, we can pursue EITHER the ASTM E1903-97 Phase II Environmental Site Assessment OR the 'local voluntary cleanup program'.
Which flooring system in project scope must be compliant?
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Alessio Zampaglione on
Hi everyone, I’m working on an office building project registered under LEED C&S2009 in which there are different flooring systems: .
Section 3.10 compliance
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Edgar Arevalo on
I'm working on a CI project that we are currently designing VAVs for the floor(s), the main AHUs are not part of the scope of work but they have VFDs.
Interior paint's VOC
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Magda Aghababyan on
According to Green Seal Standard GS-11, Paints, 1st Edition, May 20, 1993 the VOC limit for interior flat paint is 50 grams/liter of product minus water.
Air testing related to partial renovation per floor
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Julie Barth on
I have a client who is asking about air testing for an office building renovation project where small parts of each floor will be renovated.
Help with LEED ND
ND-Plan-v4 MPR1:Must be in a permanent location on existing landposted by T J on
I'm a beginner and not familiar with the certification process and actual documentation. Where can I get samples or ideas on how to to begin making a simple LEED-ND assessment report including chec
Laboratory
NC-v4 WEp2:Indoor water use reductionposted by Vanessa Montezuma Ramos on
My project is an Investigation Center which has laboratories. The lavatories found in the lab area (chemistry) should be considered in this credit?