phases of project & VOCs

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Debra a. Lombard  on 

we are a GC working on a project that is the renovation of a historic bldg and that renovation started a very long time ago '(about 3 yrs ago) and about a year before the project was registered for

2
Mon Mar 27, 2017, 2:52 pm

ASHRAE 90.1-2007 article G3.1.1 exception (a)

NC-2009 EAc1:Optimize Energy Performance
posted by  Ann-Judith Belanger  on 

Hi everyone, I have a question regarding the reference's HVAC heating energy source for my projet.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Mar 27, 2017, 12:59 pm

Baseline model for storage facility

Warehouses-NC-v4 EAc2:Optimize energy performance
posted by  Jeremiah Crossett  on 

Hi, I am working on a 5 story self storage building in Shoreline WA as the modeler.

5
Sun Mar 26, 2017, 3:35 pm

Leed 2009 NC-District cooling path one

NC-2009 EAc1:Optimize Energy Performance
posted by  Mark JIN  on 

Dear Friends, I have a project located at Dubai where a localized existing district cooling plant will be providing chilled water.

10
Default Avatar
LEEDuser Basic Member
0 thumbs up
Fri Mar 24, 2017, 1:48 pm

Green Bike Station

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Saurabh Shrestha  on 

Is there any advantage if the project locates a Green Bike Station (from where bikes could be rented) within the vicinity of the project (even if it is not within 200 yards)?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Thu Mar 23, 2017, 9:09 pm

Finished surface of structural wall?

NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Erin Holdenried  on 

Hi. Does one include the finished surface (such as tile, or painted GWB) applied to or furred out from a structural wall in this credit? Thanks!

3
Wed Mar 22, 2017, 3:46 pm

Can roofed areas be considered open space?

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Alejandro Rivera  on 

Our project is a mixed-used building in an urban area that will most probably earn SSc2.

3
Chief Consulting Officer
NÁRUM Consult
LEEDuser Basic Member
0 thumbs up
Mon Mar 20, 2017, 4:58 pm

Weld-Thru Primer

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Celimar Fournier  on 

Our structural steel subcontractor is currently using a Sherwin Williams Weld-Thru Primer at the shop location. This is for anti-corrosive/rust purposes.

3
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Mar 20, 2017, 1:58 am

ATES in combination with HP

NC-v4 EAc5:Renewable energy production
posted by  Ydo Schuuring  on 

We would like achieve points for the credit: Renewable Energy Production. The design team is considering an Aquifer Therma Energy Storage (ATES) in combination with a heatpump.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Mar 17, 2017, 10:18 pm

Credits in addition to Optimize Energy Performance?

NC-v4 EAc5:Renewable energy production
posted by  Dianne Herrin  on 

Hi - Our solar system is adding two points to our "optimize energy performance" category due to the cost offset.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Mar 17, 2017, 9:55 pm