Forum quick links
Innovation: LEED O+M Starter Kit
CS-v4 INc1:Innovationposted by Sustainability & Commissioning on
Hi all,
Restroom, public or pivate?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Norbert Harmathy on
Hello,
Warehouse exhasut ventilation
CS-v4.1 EQp1:Minimum Indoor Air Quality Performanceposted by Eric Dyer on
Hello,
Our team considering IAQ Performance about v4 BD+C CS.
The project is warehouse distribution center, so we considering IAQ performance in storage area.
5.4.3.2 Air Leakage application in no heated or cooled spaces
Warehouses-NC-v4 EAp2:Minimum energy performanceposted by Paola Moschini on
About Mandatory Provision ASHRAE 90.1-2010 point 5.4.3.2 Air Leakage. Must this prescription be applied also to fenestration and doors of a warehouse not heated or cooled?
Plastic Toilet Compartments
NC-v4.1 EQc2:Low-Emitting Materialsposted by Cindy Quinn on
Do plastic toilet compartments need to be included in the wall panels category?
Electrical Connectors in Waiting Area instead of Loading Dock Doors
Warehouses-NC-v4 LTc8:Green vehiclesposted by Armelle Le Bihan on
Hi,
Thermal Comfort control
NC-v4 EQc5:Thermal comfortposted by Gail Napell on
has anyone achieved this credit through Comfy or a similar ap?
STC composite value for gşazed wall
NC-v4.1 EQc9:Acoustic Performanceposted by murat özdemir on
Hi fellow LEED experts, I am a acoustical consultant. I have a K12 project. I checked your apc table.
Using Dry cooling tower
NC-v4 WEc3:Cooling tower water useposted by Michael on
My factory project doesn't use regular Cooling towers, they use Dry coolers (dry cooling towers), which don't use water at all. Can we claim to achieve this credit by no using make-up water?