Forum quick links
Monitoring VAV System Airflow Setpoint
NC-v4 EQp1:Minimum indoor air quality performanceposted by J Schütz on
Hello,
Solar panels effect on heat island
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Gahl Sorkin Spanier on
Does anyone know of any research relating to the effect of solar panels , or thermosolar collectors on heat island effect. Intuitively their effect should be positive as they absorb heat.
Regional Priority points
Schools-NC-v4 RPc1:Regional priorityposted by ILDA SHALLO on
How are these Regional Priority points awarded? Are these points automatically awarded once we get those credits, that also qualify as Regional Priority, awarded?
Denied Innovation Credit - where to go from here?
NC-v4.1 INc1:Innovationposted by Chyanne Husar on
We have attempted to achieve the Pilot Credit - Bird Collision Deterrence. For Design Final Review, our documentation was deemed to "not demonstrate compliance" and one point is "Denied".
What requirements apply to the big (over 8cu ft capacity) washing machines used for onsite laundry of bedding and towels?
Hospitality-NC-v4 WEc2:Indoor water use reductionposted by Beth Brownlie on
Per the EPA /Energy Star definition, the commercial washing machines are coin or card operated types for use by multiple residents of a building - this is similar to the situation for hotel guests.
What equipment does "Discharge water temperature tempering" pertain to?
NC-v4 WEp2:Indoor water use reductionposted by Beth Brownlie on
We are working on a hotel project.
When the jurisdiction does not provide waste services . . .
Hospitality-EBOM-v4.1 MRp3:Waste Performanceposted by Sabrina Flagstad on
For O+M, what to do when the project is in a jurisdiction that does not provide waste services such as compost or mixed recycling?
Advanced Metering NC Space Exemptions
NC-v4 EAc3:Advanced energy meteringposted by Alexandra Markus on
I'm working on a recreation center project that includes a daycare. The daycare space will not be fit-out as part of the project.
Part of building certification
NC-v4.1 MPR2:Must use reasonable LEED boundariesposted by Robert Yates on
I am looking to certify only part of a manufacturing building, which will be a newly built extension. In doing so, I'm wondering about where I should put my LEED boundary.