Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Use of C&S Commissioning documentation

EBOM-2009 EAc2.1:Existing building commissioning - investigation and analysis
posted by  Izabela Kwiecinska  on 

Hi Everyone, We are working on a building that already got LEED C&S certificate in 2012 and now aims to get EBOM.

1
Fri Feb 10, 2017, 8:56 pm

Floor Coatings Compliance with IEQc4.3 in LEED 2009

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Mario S.  on 

We have a concrete floor, and we plan on putting a coating on top of the concrete finish.

1
Fri Feb 10, 2017, 7:05 pm

Humidifier / Economizer / Energy Recovery

CS-2009 EAp2:Minimum energy performance
posted by  Samuel Sura  on 

Hi, I would like to ask 3 simple questions: 1) if a humidifier in proposed AHU is presented, can it be considered as a process load and thus modeled in baseline?

1
Fri Feb 10, 2017, 6:11 pm

Energy and Atmosphere credit #5

NC-2009 EAc5:Measurement and verification
posted by  James Goldfield  on 

I had a question in regards to the energy and atmosphere credit #5 which states a need for a measurement and verification plan.

1
Fri Feb 10, 2017, 7:06 pm

Prefinished wood flooring

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Brianna Brandsen  on 

when installing prefinished wood flooring in a building that is attempting LEED certification, does the finish need to be compliant with LEED regulations, as you are not applying the finish on site

1
Fri Feb 10, 2017, 7:02 pm

Total Site Area within LEED Project Boundary

NC-2009 PIf2:Project Summary Details
posted by  Sara Goenner Curlee  on 

I feel like I should know this, but can someone confirm for me whether or not the building footprint is included in the Total Site Area?

1
Fri Feb 10, 2017, 9:38 pm

International Project - Case 2 Option 1 or Option 2

EBOM-2009 EAc1:Optimize energy efficiency performance
posted by  Sheena Moses  on 

Dear all, The case 2 calculator has pointed us towards using Case 2 - Option 1 for our Existing Retail Mall project located outside of the US.

1
Tue Aug 29, 2017, 6:19 pm

Mall Situation

Retail-CI-v2009 WEc1:Water use reduction
posted by  Brightworks Sustainability  on 

If my retail space within a mall is for FTE only, but the retail customers will have access the mall's core restrooms, must these be included in WEc1 calculations?

1
Thu Feb 16, 2017, 5:52 pm

Baseline system selection

NC-2009 EAp2:Minimum energy performance
posted by  MKK LEED  on 

I have a building that is roughly 20,000ft2 of office, plus another 13,000ft2 of underground parking that is heated to 50F.

1
Tue Feb 14, 2017, 12:10 am

Commercial Coffee Brewers

CI-2009 EAc1.4:Optimize energy performance - equipment and appliances
posted by  Donald Green  on 

Under the Energy Star Partner Program there is a listing for Commercial Coffee Brewers V1.0 as of 7/2016 - however when you go to the Find Products there is NO listing for Commercial Coffee Brewers

1
Tue Feb 14, 2017, 3:34 pm