The assembly calculator for recycled content output is a dollar amount contribution. The master Materials and Resources spreadsheet requires pre- and post consumer recycled content as input (and the overall assembly cost) to generate the dollar amount contribution for this credit. These two pieces don't work together, it seems. Perhaps I have an old version of the assembly calculator. How is it normally used to document this credit?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Jon Clifford
LEED-AP BD+CGREENSQUARE
LEEDuser Expert
323 thumbs up
February 4, 2017 - 5:09 pm
Maria—You are probably referring to LEEDuser’s Assembly Calculator spreadsheet. You are right that it is outdated. USGBC has completely revised their master MR spreadsheets over the past couple of years, and the two tools no longer work together. To fix this problem, see this discussion on LEEDuser’s NC-2009 MRc4 forum: http://www.leeduser.com/comment/redirect/59587.