Baseline Pumping Power
NC-2009 EAp2:Minimum Energy Performanceposted by Ahmed Labeeb on
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.
Use of C&S Commissioning documentation
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Izabela Kwiecinska on
Hi Everyone, We are working on a building that already got LEED C&S certificate in 2012 and now aims to get EBOM.
Floor Coatings Compliance with IEQc4.3 in LEED 2009
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Mario S. on
We have a concrete floor, and we plan on putting a coating on top of the concrete finish.
Humidifier / Economizer / Energy Recovery
CS-2009 EAp2:Minimum Energy Performanceposted by Samuel Sura on
Hi, I would like to ask 3 simple questions: 1) if a humidifier in proposed AHU is presented, can it be considered as a process load and thus modeled in baseline?
Energy and Atmosphere credit #5
NC-2009 EAc5:Measurement and Verificationposted by James Goldfield on
I had a question in regards to the energy and atmosphere credit #5 which states a need for a measurement and verification plan.
Prefinished wood flooring
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Brianna Brandsen on
when installing prefinished wood flooring in a building that is attempting LEED certification, does the finish need to be compliant with LEED regulations, as you are not applying the finish on site
Total Site Area within LEED Project Boundary
NC-2009 PIf2:Project Summary Detailsposted by Sara Goenner Curlee on
I feel like I should know this, but can someone confirm for me whether or not the building footprint is included in the Total Site Area?
International Project - Case 2 Option 1 or Option 2
EBOM-2009 EAc1:Optimize Energy Performanceposted by Sheena Moses on
Dear all, The case 2 calculator has pointed us towards using Case 2 - Option 1 for our Existing Retail Mall project located outside of the US.
Mall Situation
Retail-CI-v2009 WEc1:Water use reductionposted by Brightworks Sustainability on
If my retail space within a mall is for FTE only, but the retail customers will have access the mall's core restrooms, must these be included in WEc1 calculations?
Baseline system selection
NC-2009 EAp2:Minimum Energy Performanceposted by MKK LEED on
I have a building that is roughly 20,000ft2 of office, plus another 13,000ft2 of underground parking that is heated to 50F.