Phytoclimatic Glass

Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environment
posted by  Brian Harris  on 

We have a project that has electric photochromic Glass. The tint of the glass will change based on the sun's intensity hitting the windows.

1
Fri Jul 14, 2023, 4:34 pm

Justification of usign the 9.6.2 Additional Power lighting in the Baseline Model

NC-v4.1 EAp2:Minimum Energy Performance
posted by  Marc Maso  on 

Dear srs, I'm doing a convention center in Arabia Saudi and we justify the LPD of the baseline model as this way:

1) We have chosen the Basic Power Allow ASHRAE (Table G3.7)

3
Thu Jun 22, 2023, 2:56 pm

Minimum Outside air in DCV systems

NC-v4.1 EQp1:Minimum Indoor Air Quality Performance
posted by  Marc Maso  on 

Dear Srs, we are using the DCV strategy in one building. The doubt are when we need to ventilated or not...

A room have a schedule of 8am to 18:00

0

Calculation of Vegetated Area

NC-v4 SSc3:Open space
posted by  Osman Faroq  on 

Dear LEED Users, 

1
Tue Jun 4, 2024, 5:54 am

Regional Priority credit for an L&T credit

CI-v4 LTc1:LEED for neighborhood development location
posted by  Cindy Quinn  on 

Our project is located in an ND Gold certified neighborhood.  If we pursue the LEED for ND location credit in leiu of other L&T credits, how can we receive a Regional Priority point for Ac

1
Thu Jun 22, 2023, 1:35 am

Multi-family Stormwater alternative documentation

NC-v4.1 SSc4:Rainwater Management
posted by  Summer Gorder  on 

Our project is in Seattle with stringent Stormwater requirements.

1
Mon Jun 19, 2023, 6:11 pm

Zone Secondary Recirculation Fraction

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Dave Hubka  on 

ASHRAE 62.1, Section A1.2.2 states:

Er is less than 1.0 for plenum return systems with secondary recirculation (e.g. fan-powered VAV with plenum return)

1
Thu May 8, 2025, 5:58 pm

Creating Baseline ΗVΑC system selection based on ΑSHRAE 90.1-2010 - Does Ground Floor count as….

NC-v4 EAc2:Optimize energy performance
posted by  Konstantina Kalliakoudi  on 

Hello to all LEED Users,

 

Ιn our project the Building (nonresidential – 8.000 m2)  consists of following levels:

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jun 16, 2023, 4:27 pm

Bioretention Area Calculation

NC-v4 SSc4:Rainwater management
posted by     on 

I was wondering about how to calculate the Area of bioretention needed to manage expected runoff on the Reference Guide v4 example.

6
Architect
VALENTINI ARCHITETTURE
LEEDuser Premium Member
1 thumbs up
Thu Jun 15, 2023, 10:42 pm