Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

ESC Plan equivalent

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Vanessa Montezuma Ramos  on 

Hi, we have some doubts about the equivalency of the ESC plan according to our local standards.

1
Sun Jan 8, 2017, 5:47 pm

Verified Recycling

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Bharati Bhosale  on 

Apart for from added costs, are there additional requirements that the construction team should be aware of in terms of onsite sorting/ specific dumpster requirements that need to be met in-order t

1
Tue Jan 3, 2017, 4:29 pm

Baseline system for water loop heat pump in Proposed case

NC-2009 EAp2:Minimum Energy Performance
posted by  Mayank Bhatnagar  on 

Hello everyone, I am working on a residential project. The proposed case HVAC system is Water loop heat pump with cooling tower and natural gas based condensing boilers.

1
Wed Jan 4, 2017, 2:57 pm

Future Process Loads

NC-2009 EAp2:Minimum Energy Performance
posted by  Victoria Watson  on 

Hi, I am working on a hangar project.

1
Wed Jan 4, 2017, 4:58 pm

Number of Showers

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Melanie Silver  on 

I have a very large Core & Shell office building that is over 300,000 square feet.

1
Wed Jan 4, 2017, 6:05 pm
1
Thu Jan 5, 2017, 2:55 pm

Advanced Energy Modeling Guide for LEED Technical Manual

CS-v4 EAc2:Optimize energy performance
posted by  Ciaran McCabe  on 

Does anyone know if there will be an Advanced Modeling Guide for Version 4 and when it might be released.

1
Thu Jan 5, 2017, 2:56 pm

Calculations for an Elementary School

Schools-NC-v4 LTc7:Reduced parking footprint
posted by  Cynthia Kaplan  on 

We are trying to figure out how to translate our ITE calcs properly for an elementary school project.

1
Wed Jan 18, 2017, 1:00 am

Layers of Glazing?

CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spaces
posted by  Jonathan Weiss  on 

OK, I may be crazy, but I recall the requirement limiting the number of layers of internal glazing that can be "viewed" through.

1
Tue Apr 11, 2017, 7:57 pm

Minimum Daylight Level

CI-2009 IEQc8.1:Daylight and Views—Daylight
posted by  SAMY Chamy  on 

Dear Sir:- what is a minimum daylight requirement for LEED CI 1.270 Lux (25 FC) 2.110 Lux (10 FC) in LEED CI reference guide it is 25 FC so please clarify is there any addenda

0