Requirements

Achieve any combination of requirements in the following three options:

Option 1. Location type (1-5 points)
Locate the project in one of the following locations:
  • A previously developed site that is not an adjacent site or infill site (1 point).
  • An adjacent site that is also a previously developed site (2 points).
  • An infill site that is not a previously developed site (3 points).
  • An infill site that is also a previously developed site (5 points).

AND/OR

Option 2. Connectivity
Locate the project in an area that has existing connectivity, as listed in Table 1. Measure connectivity one of two ways:
  • within 1/2 mile (800 meters) of the project boundary; or
  • within the project and within ½ mile (800 meters) of the project boundary.
  • Intersections within the site may be counted if the intersections were not constructed or funded by the developer within the past ten years. Table 1. Points for connectivity within 1/2 mile of project

    Intersections per square mile

    Intersections per
    square kilometer

    Points

    200-249

    78-96

    1

    250-299

    97-115

    2

    300-349

    116-134

    3

    350-399

    135-153

    4

    400 or more

    ≥ 154

    5

See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Achieve any combination of requirements in the following three options:

Option 1. Location type (1-5 points)
Locate the project in one of the following locations:
  • A previously developed site that is not an adjacent site or infill site (1 point).
  • An adjacent site that is also a previously developed site (2 points).
  • An infill site that is not a previously developed site (3 points).
  • An infill site that is also a previously developed site (5 points).

AND/OR

Option 2. Connectivity
Locate the project in an area that has existing connectivity, as listed in Table 1. Measure connectivity one of two ways:
  • within 1/2 mile (800 meters) of the project boundary; or
  • within the project and within ½ mile (800 meters) of the project boundary.
  • Intersections within the site may be counted if the intersections were not constructed or funded by the developer within the past ten years. Table 1. Points for connectivity within 1/2 mile of project

    Intersections per square mile

    Intersections per
    square kilometer

    Points

    200-249

    78-96

    1

    250-299

    97-115

    2

    300-349

    116-134

    3

    350-399

    135-153

    4

    400 or more

    ≥ 154