Forum quick links
Campus road
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Susan Di Giulio on
We have a project on a university campus. The university maintains the roads on the campus, although there is public access 24/7.
School staff spaces closer to entrance than LE/FEV spaces
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by C Michael Ross on
Our project is a high school building with parking separated into different areas for visitors, staff, and students.
Acoustic Test in the Field
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Holly Van Straten on
I am a manufacturer of HVAC equipment that is installed in a classroom. Due to this prerequisite I get frequently asked if we "meet LEED standards".
EAP2 case 1 for international projects
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Elodie DUMAS on
I have a question about the following statement from above : "We have an international project and the space type is eligible for an Energy Star rating.
Better to include PV in the ASHRAE model or calc outside?
NC-2009 EAp2:Minimum Energy Performanceposted by Carol Roberts on
We are working on an ASHRAE 90.1 model in Nevada and are adding the solar information manually to the LEED online forms, post energy modeling (so our solar energy is not appearing on the software g
Window to Wall ratio uniform?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I recently noticed LEED Reference Guide for EAc1 Example Option 1 (p278) says we need to redistribute the window to wall ratio uniformally on each orientation of the building.
Soil used as filling material can count for MRc5?
CS-2009 MRc5:Regional Materialsposted by Alicia Villanueva on
Does the soil used as filling material for the construction can count for MRc5? It is permanently installed in the building, and the Reference Guide doesn´t mention it as in MRc2 where excavated so
Planned City Bus Stop and Shuttle?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Cynthia Estrada on
I've seen a few postings but no solid information on whether or not GBCI will accept verified plans for either a shuttle bus and/or a planned additional bus stop to an existing route.
Equipment Baseline
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by LUCY WILLIAMS on
Our team is considering pursuing this credit, but it is unclear what baseline the specified equipment is to be measured against.
Non occupied spaces
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Hello, Is nonoccupied spaces are affected by this credit ?