Forum quick links
Floor Diffusers
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Mike oliva on
I'm looking for clarification on how to handle air speed for floor diffusers at the perimeter of a large lobby space.
Core area added to boundary?
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Graham Langton on
"When a project has replaced some of the core fixtures, they have essentially brought those fixtures into their LEED-CI project scope of work." A project in which fixtures are replaced in the core
Skylights
NC-v4 EQc7:Daylightposted by Keith Lindemulder on
I haven't seen any comments about how to calculate the daylight value of skylights. Has the prescriptive path been eliminated completed from LEED v4?
Automatically earn credit?
CI-v4 IPc1:Integrative processposted by Maria Glädt on
Will you earn this credit automatically if your in a LEED v4 project which has been awarded with this credit?
Multiple services under one roof & sidewalks
CI-2009 SSc2:Development Density and Community Connectivityposted by Katie Raymond on
My project is located within a half mile of a Target.
Data Center Energy Performance Calculator
NC-2009 EAp2:Minimum Energy Performanceposted by Wei Jiang on
Dear all, We are trying to calculate the IT & electricial energy consumption of a data center, using the Minimum Energy Performance Data Center Calculator.
Baseline for Interior glass
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
What should be the baseline for interior glazing such as for atrium and partitions? Generally, the designed case will be SGU with high U value and SHGC.
Non certified factory with new process area aiming certification
Retail-CI-v2009 PIf1:Minimum Program Requirementsposted by Valentin Grimaud on
Dear community, We have had a recent enquiry from a client. He has an existing industrial site, which is non certified. He wants to relocate another industrial activity in this site.
initial cost for lease
CI-2009 EAc3:Measurement and Verificationposted by Monica Hue on
Is there are is an initial fee that must be paid upfront when the tenant signs the lease to pay for energy use? If there is this fee, how much does that typically cost?
Licensed Professional
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Tam Kin Hung on
To comply with the requirement of this prerequisite, data verification checklist and SEP should be submitted.