Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Contractor CoC

CS-2009 MRc6:Certified Wood
posted by  LEED Pro Consultant  on 

We are pursuing certified wood credit for a CS v.2009 mixed use building.

1
Tue Jul 29, 2014, 1:28 am

ASHRAE 62.1

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Mike D  on 

Clause 5..9 in ASHRAE 62.1 requires MERV 6 filters on all cooling coils or other surfaces. This will very much affect the energy efficiency of the systems.

0

Middle School Student Waiting Rooms

Schools-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Sara Zoumbaris  on 

Hi All, We have a middle school project that has 2, internal waiting rooms for students; one is for waiting to go into the school clinic and one is for waiting to go into the hearing/ eyesight tes

1
Wed Jan 6, 2016, 6:58 pm

Number of showers for men and women

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  CT G  on 

Hello, We are working on a LEED-CS project which required 14 showers per the FTE count. The architect is proposing to locate 8 showers within the women´s locker room, and 6 within the men´s.

1
Tue Jul 29, 2014, 7:28 pm

Sustainable Site Prereq 2.1 Site Assessment NCv4 SSc1

Hospitality-NC-v4 SSc1:Site assessment
posted by  Tyra Sorensen  on 

Where can I find this resource? Sustainable Sites Initiative: Guidelines and Performance Benchmarks 2009 I've only been able to find it in the digital archive one page at a time.

1
Sun Apr 10, 2016, 4:53 pm

Preferred parking outside the LEED project boundary

CI-2009 SSc3.3:Alternative Transportation—Parking Availability
posted by  Morteza Kasmaei  on 

The total area of this LEED-CI project is more than 75% of its LEED-CS building area and there is no parking space in the LEED boundary of the building, but there is a public parking across the str

1
Mon Aug 4, 2014, 1:11 pm

LPD Method for the Baseline Energy Model.

NC-2009 EAc1:Optimize Energy Performance
posted by  Khaled Fouda  on 

Do I have to chose one categorization procedure (Building Area or Space by Space Method) to determine the lighting power density (LPD) in the Baseline Energy Model? My building is Mixed-Use so I h

1
Wed Jul 30, 2014, 7:12 pm

Batteries Required?

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Sara Zoumbaris  on 

Are batteries indeed required for this credit? If so, where is this specifically stated in a reference or LI? Thanks!

1
Thu Dec 11, 2014, 6:23 pm

Special situation

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  Andres Giraldo  on 

Hi, I would like to know if there is any special validation to my situation: We used to have irrigation from the faucets, what means an irrigation with potable water, but we are attempting to get

1
Thu Jul 31, 2014, 4:58 pm