We are creating a Revit model using Revit 2014. Going for LEED2009, (ASHRAE 90.1-2007). Do we need two models? Thinking of bringing model into eQUEST. Is that necessary to determine baseline vs. design? Or can it all be done in Revit and Green Building Studio?
Thanks for input.
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5909 thumbs up
July 2, 2014 - 11:52 am
You will need to do the final model in software like eQUEST comparing the Appendix G Baseline to the building as designed. I do not think you can do the final model within Green Building Studio but I have not looked at it lately. GBS is a wonderful tool for performing design phase modeling to evaluate possible strategies.