Forum quick links
Multilevel lighting control
NC-v4.1 EQc6:Interior Lightingposted by Michael on
I have 10 lighting fixtures in an office space, and the architect is providing 3 on-off switches:
- switch 1, on-off 5 lightings (50% of lighting numbers)
Understanding Pilot-Credits IPpc101
Pilot-Credits IPpc101:Integrative Processposted by Fatimah Razak on
Dear forum members,
Emissions for a District System in the Minimum Perfomance Calculator
Retail-CI-v4.1 EAp2:Minimum Energy Performanceposted by Marc Maso on
Hello, I have a building with a district system for cooling, heating and DHW.
LEED Coversheet reporting for Steel
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Allison Para on
Hello Pros,
In regards to listing structural and interior steel products on the LEED coversheet.
Open office space control
NC-v4.1 EQc6:Interior Lightingposted by Soha ElYamany on
I was wondering if anyone was able to comply with the multi-level control requirements in an open office space, realistically speaking, I am not sure how an office space with over 100 people for ex
Inherently Non-emitting materials
NC-v4 EQc2:Low emitting materialsposted by Scott Adams on
Would cement mortars and grouts containing 0 VOCs be considered Inherently Non-emitting?
Exemption for workshop spaces?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Adrienne Franz on
We are doing a building where half the building is offices and the other half is workshops for parks maintenence staff. (I'm talking mechanical, carpentry, tree crew).
ID+C project in LEED Core & Shell certified building
CI-v4 LTc1:LEED for neighborhood development locationposted by Subhashkumar A on
ASHRAE 90.1-2010 Envelope mandatory requirements
Healthcare-v4 EAp2:Minimum energy performanceposted by Ayesha Nakhwa on
Hi all,
As per ASHRAE 90.1-2010: 5.4.1 Insulation. Where insulation is required in Section 5.5 or 5.6, it shall comply with the requirements found in Sections 5.8.1.1 through 5.8.1.9.