Forum quick links
Building Footprint- Underground Wine Caves
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Kevin Gilleran on
We are working on a winery project with an above ground winery building and connected underground wine storage caves.
population diversity factor
EBOM-2009 IEQc1.3:IAQ Best Management Practices—Increased Ventilationposted by Katherine Ann Resurreccion on
Our project is an office building with 300 regular occupants. One zone/occupancy category of the building is a multi-purpose room.
Certifying floor area
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Romain Bourcier on
Dear all, My client has an existing mixed-use building. There are stores on the ground floor and offices on the upper floors. The refurbishment works only apply to the offices areas. Do I have to
Natural Ventilation Interpretation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Nandana Kumar on
Hi, Can anyone kindly interpret the sentence below from ASHRAE 62.1 2007 'All naturally ventilated spaces must be within 25' of (and permanently open to) operable wall or roof openings to the outdo
Default Budget %
CI-2009 MRc5:Regional Materialsposted by Nate Maniktala on
What is the 'Default Budget Percent'? In NC, it is as stated as 45% but CI does not mention this percentage specifically.
Are glulam beams included in credit EQ4.4
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Joanne Sawatzky on
We are wondering if glulam beams need to contain no added urea formaldehyde? thanks curtis
LEED-CS v2.0
NC-2009 PIf1:Minimum Program Requirementsposted by Jodie Clarke on
I have a project that registered using LEED-CS v2.0 in 2007.
submit to leed-online compliance
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ron Dean on
Good day, i wonder what is the time that I can submit the M&V plan for credit 5.1. May I submit it when the construccion is finished with the rest of the credits for C&S certification or I
GCBI project review cost
NC-2009 PIf2:Project Summary Detailsposted by Michael Kros on
I submitted a project for D&C review. The project is a 25,000 SF addition to an already LEED certified building of 60,000 SF.
Reuse of Light Fixtures and Mechanical Vents
CI-2009 IDc1:Innovation in Designposted by Caro Wilbanks on
I am wondering if the reuse of light fixtures and mechanical vents has ever been used towards an ID credit. I understand that these divisions are not counted towards any of the MR credits.