Building Footprint- Underground Wine Caves

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Kevin Gilleran  on 

We are working on a winery project with an above ground winery building and connected underground wine storage caves.

1
Fri Dec 14, 2012, 6:02 pm

population diversity factor

EBOM-2009 IEQc1.3:IAQ Best Management Practices—Increased Ventilation
posted by  Katherine Ann Resurreccion  on 

Our project is an office building with 300 regular occupants. One zone/occupancy category of the building is a multi-purpose room.

1
Tue Dec 18, 2012, 10:48 pm

Certifying floor area

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Romain Bourcier  on 

Dear all, My client has an existing mixed-use building. There are stores on the ground floor and offices on the upper floors. The refurbishment works only apply to the offices areas. Do I have to

1
Tue Dec 11, 2012, 4:48 pm

Natural Ventilation Interpretation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Nandana Kumar  on 

Hi, Can anyone kindly interpret the sentence below from ASHRAE 62.1 2007 'All naturally ventilated spaces must be within 25' of (and permanently open to) operable wall or roof openings to the outdo

1
Fri Dec 21, 2012, 5:20 pm

Default Budget %

CI-2009 MRc5:Regional Materials
posted by  Nate Maniktala  on 

What is the 'Default Budget Percent'? In NC, it is as stated as 45% but CI does not mention this percentage specifically.

1
Fri Dec 7, 2012, 5:55 pm

Are glulam beams included in credit EQ4.4

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Joanne Sawatzky  on 

We are wondering if glulam beams need to contain no added urea formaldehyde? thanks curtis

1
Fri Dec 7, 2012, 11:07 pm

LEED-CS v2.0

NC-2009 PIf1:Minimum Program Requirements
posted by  Jodie Clarke  on 

I have a project that registered using LEED-CS v2.0 in 2007.

1
Mon Dec 10, 2012, 2:13 pm

submit to leed-online compliance

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ron Dean  on 

Good day, i wonder what is the time that I can submit the M&V plan for credit 5.1. May I submit it when the construccion is finished with the rest of the credits for C&S certification or I

1
Mon Dec 10, 2012, 4:30 pm

GCBI project review cost

NC-2009 PIf2:Project Summary Details
posted by  Michael Kros  on 

I submitted a project for D&C review. The project is a 25,000 SF addition to an already LEED certified building of 60,000 SF.

1
Mon Dec 10, 2012, 10:10 pm

Reuse of Light Fixtures and Mechanical Vents

CI-2009 IDc1:Innovation in Design
posted by  Caro Wilbanks  on 

I am wondering if the reuse of light fixtures and mechanical vents has ever been used towards an ID credit. I understand that these divisions are not counted towards any of the MR credits.

1
Fri Dec 14, 2012, 7:56 pm