Forum discussion

Schools-2009 SSc5.1:Site Development—Protect or Restore Habitat

Greenfield Sites1: site disturbance

Sincere Apologies for reposting the question but anyone out there could assist.Thank you!! If the Master plan level School project's (Multiple buildings within the development) site boundary will be enclosed by the 3 meter Wall (Location is in Middle East and no surrounding developments) please advise, 1. How shall I identify the Limit of site disturbance (40/25/15/10 feet?) 2. The surface parking will have the Solar PV panels as the Shading roof so do I have to treat them as parking garage and limit the site disturbance to 40 feet? 3. Enabling works temporary offices (Outside the building perimeter), shall I include or exclude them while defining the site disturbance boundary? Thank you

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 11/22/2012 - 23:54

Ameet, I'll try to answer your questions.1) Are you asking which distance applies to the wall itself? What kind of wall is it?2) I think a case could be made for this to be either 40 or 10 feet. I'd suggest going with 10, calling the solar panels "small utilities."3) This could be argued either way, but I would ideally not count these as buildings when defining the boundary.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.