If the Master plan level School project's (Multiple buildings within the development) site boundary will be enclosed by the 3 meter Wall (Location is in Middle East and no surrounding developments) please advise,
1. How shall I identify the Limit of site disturbance (40/25/15/10 feet?)
2. The surface parking will have the Solar PV panels as the Shading roof so do I have to treat them as parking garage and limit the site disturbance to 40 feet?
3. Enabling works temporary offices (Outside the building perimeter), shall I include or exclude them while defining the site disturbance boundary?
Thank you
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11478 thumbs up
November 22, 2012 - 6:54 pm
Ameet, I'll try to answer your questions.1) Are you asking which distance applies to the wall itself? What kind of wall is it?2) I think a case could be made for this to be either 40 or 10 feet. I'd suggest going with 10, calling the solar panels "small utilities."3) This could be argued either way, but I would ideally not count these as buildings when defining the boundary.