NC-v4 WEc4:Water meteringposted by Michelle Rosenberger on
It seems that many credits no longer ask for any backup to be uploaded. Including this one. This lack makes us uncomfortable because we've always uploaded plans sheets.
Building will be used by the client, not be leased to 3rd party. need of "tenant design & construction guidelines document"?
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by prudhvi mahadev on
hello,
Consideration of Manmade Ponds in Protect or Restore Habitat Credit Calculations.
NC-v4.1 SSc2:Protect or Restore Habitatposted by Subhashkumar A on
In one of our project, the site includes man-made ponds, which are used as rainwater storage ponds.
What is the Exact Definition of A Trip?
NC-v4 LTc5:Access to quality transitposted by Krithikha Muthukrishnan on
I am posting this question largely because the credit langauage is not very clear(maybe language nativity issues here). In the Reference Guide, "A Trip" is defined as follows-
Preheat coil requirement in baseline
NC-v4.1 EAp2:Minimum Energy Performanceposted by Samer Hassanie on
Hi,
It is not clear from G3.1.3.19 where the preheat coil should be placed.
Is it upstream or downstream the economizer and the heat exchanger?
Off-street parking provided is less than minimum required spaces for EV-ready.
NC-v4.1 LTc8:Electric Vehiclesposted by Erica Downs on
Our project only has 5 parking spaces (all off street), and these are for employees only (FTE = 6), including one HC space.
No parking for the project
CI-v4 LTc5:Reduced parking footprintposted by Ricardo Sá on
I understand that LEED v4 CI specifically states that "if there is existing parking associated with the project, it must comply with the requirements of the credit and show a percentage reduction b
Waste performance yields a score of zero points in ARC
EBOM-v4.1 MRp3:Waste Performanceposted by jimmy Adames on
Hi, Our building is a very automated distribution center for an apparel company. Due to the nature of the business, we receive cardboard cases with product and before it ships to customers, a
One-time air testing: how to enter readings in the ARC platform
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by jimmy Adames on
Greetings, I have a few questions regarding this credit.