Forum quick links
Exterior Lighting for LEED ID+C
CI-v4.1 EAc2:Optimize Energy Performanceposted by Alvin Michael Velasco on
Hi.. We are working on a LEED CI project where 100% of the building spaces are part of the LEED scope. In this scenario, are exterior lightings required to be included in the energy model?
Change to CxA Scope
NC-v4 EAp1:Fundamental commissioning and verificationposted by Adrienne Franz on
Hello,
V5: requirements for EPDs
NC-v4.1 MRc2:Environmental Product Declarationsposted by Gary Soe on
Hi all,
LEED v4.0 Energy Model: How to Handle Unknown (Central Plant) Equipment Data for Tenant Fit-Out?
CI-v4 EAc2:Optimize energy performanceposted by on
I’m working as an energy modeler on a 3‑floor office fit‑out within a 42‑story building in New York City (LEED v4.0).
Integrative Analysis of Building Materials
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by on
The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits.
Easily Achievable Where Mandates are in Place
Pilot-Credits SSpc129:Comprehensive Compostingposted by Marsha Gentile on
This pilot credit is easily achievable where mandates and infrastructure (by municipality and/or base building in case of CI project) are in place.
Staff-Only Collection in Hotel Guest Floors
Hospitality-NC-v4 MRp1:Storage and collection of recyclablesposted by Amgad Khattab on
We are pursuing LEED BD+C: Hospitality certification and have a question regarding the Storage and Collection of Recyclables prerequisite.
Baseline Pumping Power
NC-2009 EAp2:Minimum Energy Performanceposted by Ahmed Labeeb on
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mention the effect of pumps' head.
Testing Protocol and Training Requirements
Pilot-Credits INpc137:Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Beth Brownlie on
Cleanliness Protocols: Wondering if there has been any pushback from Operators/Facility staff on these protocols and the training requirements?