Forum quick links
ASHRAE 90.1-2016 Appendix G Baseline Heatsource
CI-v4 EAp2:Minimum energy performanceposted by Eric Dyer on
Hello,
We are working on a LEED v4.1 BD+C project where the proposed design uses both District Hot Water (Purchased Heat) and District Chilled Water (Purchased Cooling).
Issues Minimum Energy Performance Calculator
NC-v4 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear All:-
we have working LEED Group Project Building with 5 nos of Building
Review comment on PV-A report
NC-v4 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
Dear all,
Electricity with Demand Flexibility
Pilot-Credits EApc152:GridOptimal Building ACPposted by Cory Duggin on
What is the best way to determein any electricity with demand flexibility? What should I input in the form if it is 0? If I enter 0 it acts like all fields haven't been filled out, so I
Trend of water meter and leak sensor in Japan projects
Pilot-Credits WEpc153:Water Leak Detection and Monitoringposted by Yohei Ohashi on
I am seeking to achieve Pilot-Credits WEpc153 - Water Leak Detection and Monitoring for LEED ID+C. The Project in Japan generally is required to install a tenant level water meter and
Design for IAQ and Infection Control
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Rihab Joucht on
Design for IAQ and Infection Control requirements include meeting the minimum outdoor air ventilation requirements of ASHRAE 62.1-2016 and using filters rated MERV13 or higher.
Design submittal or construction submittal
Pilot-Credits IPpc93:Prevention through Designposted by Dionisio Franca on
Is there any guidance on whether this credit can be submitted during the design submittal?
LEED v5 BD+C, WEc2 Enhanced Water Efficiency
NC-v5 WEc2:Enhanced Water Efficiencyposted by Dave Hubka on
Language in the reference guide states, "the calculations must include all restroom fixtures necessary to meet the occupant's needs (toilets, urinals, lavatories, and showers) when seeking LTc4: Tr