Pressure loss calculation
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Yaser Al Sharif on
We are registed for commercial interior rating system , the system installed in our project is vrv system, in order to comply with optimize energy performance EAC1.3 , critical path supply duct pre
CPG - Efficiency Compliance
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Jonathan Caisido on
Hello, I would like to know on how to comply CI EAc1.3 if using base build Chilled Water Fan Coil Units.
Optimize Energy Performance -HVAC-
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Gustav Alfaro on
Hi, I have a couple of questions regarding EAc1.3 1.
Option 1: Zoning and controls
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Diego Pietzsch on
I've been working in a LEED CI: Retail for a small store in a mall. I'm wondering to persue the option 1: zoning and controls for the project but i'm not sure if the sales floor of the store shoul
Breakdown of HVAC points
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Chilufya Lombe on
Hi, for the HVAC Equipment points (5), our project meets the requirements of sections 1.4 and 2.9 of the core performance guide but not 3.10 since the system is constant volume (as most VRF and inv
Option 2 -question regargind baseline/budget building-
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Gustav Alfaro on
Hi to all: On regards Option 2, the Reference Guide is clear about the thresholds that must be achieved as HVAC systems annual cost savings, but it is not clear if those savings can be boosted by
Energy Model Scope - Shared HVAC Plant
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by TOMAS URIBE on
Hello there. We have a project that will be applying for LEED certification under CI. The project is located on 4th floor within an office building with 5-floors.
Prescriptive Approach
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Harsharan Kaur on
Hi, We are working for a CI project where the developer has provided a centralized HVAC system. We are following a prescriptive path for the HVAC compliance under EA Cr 1.3.
EAc1.3 Option 2: Baseline vs Alternate Baseline
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ken Williams on
I am working on a small building that is pursuing LEED CI. The building is comprised of two tenant spaces, office and restaurant/dining.
Data centre and office
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Chilufya Lombe on
Hi, we have 2 buildings on our site pursuing two separate certifications. One is an office building and the other a data centre (one client).