Testing Exhaust Fans
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by cathy keagle on
Does anyone have advice for a building where we are unable to find the drawings which specify the Design CFM for some of the exhaust fans?
Measured rates far exceeding ASHRAE requirements
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Nelina Loiselle on
Just compared the OA rates measured at each AHU by the TAB contractor with our ASHRAE calculations.
VAV minimum for Ds
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by George Kotsis on
Hello All: Is there any specific requirement from LEED for what the VAV minimum should be during cooling or heating?
Mutiple Critical Zones
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Judith O'Driscoll on
Our review comments indicate that we need to show multiple critical zones for certain AHU but the ASHRAE 62.1 calculator seems to only allow input for 1 critical zone. How do I add additional?
OA damper that closes at certain conditions
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Darin Amsberry on
We are working on getting an 8-story office building LEED EBOM certified. The system utilizes large built up air handlers to provide supply air to fan powered VAV boxes.
VRP Compliance Calculator
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Julian Schinke on
Hi together, I have a question about using the VRP Compliance calculator. Have I only to consider occupied spaces respectively spaces which are intend to be occupied.
Excluded Spaces - 10%
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Christopher Schaffner on
EBOM allows up to 10% of spaces to be excluded from certain credit calculations. Can we exclude any spaces from the calculations for IEQp1?
Value input for “Measured outdoor airflow, CFM”
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Patricia Fuertes on
In this prerequisite we are following Case 1 and filling in details in the 2007UM-62MZ Calculator.
VAV Systems
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by David Hubka on
When demonstrating ASHRAE 62.1 compliance for VAV systems, what is the best approach to simulate worst case system conditions expected during normal ventilation operations?
Does 62MZ calculations needed?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Dorilee Torres on
I am working with a facility to determine if they can meet the prerequisite for the LEED EBOM. Currently the facility has 12 AHU's, some of them working for the same single space.