single or multi-zone?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Guilherme Ramos  on 

Our building is fully occupied by the same company, so all the floors have similar open space layout, except for enclosed managers or small meeting rooms. There´s an outside air intake in each AHU

5
Tue Oct 24, 2023, 2:55 pm

Minimum Indoor Air Quality Performance Calculator: critical zones and demand-controlled ventilation

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Vincent Dupuy  on 

We are working on certifying a building (EBOM 2009) and we want to use the Minimum Indoor Air Quality Performance Calculator  

0
2
Wed Aug 1, 2018, 7:05 pm

IEQp1 form - Selecting Critical Zones

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Madushan Samarakoon   on 

How to answer the following requirement in the IEQp1 form when you already filled the Minimum IEQ perfromance calculator with all occupiable zones in it and it has already automatically selected th

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Mon Jul 30, 2018, 12:18 pm

Demand Control Ventilation (DCV) Compliance Documentation?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Robert Pickering  on 

We are working on certifying a building that has demand-controlled ventilation (DCV), controlled by CO2 sensors.

1
Thu Dec 21, 2017, 12:06 am

ASHRAE 62MZ calculator

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Mark Frey  on 

I try to fill out the ASHRAE 62MZ calculator and have some problems with it: 1) We have lots of AHUs in our building (Some Vanitlation systems, some AC-systems and some are only exhaust systems).

1
Wed Jan 18, 2012, 4:11 pm

Subtracting built-in furniture/casework from square footage

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  American University  on 

We've had a designer tell us that built-in furniture and case work (like a fan-coil unit enclosure) can be deducted from the square footage of a room when calculating the window opening requirement

1
Thu Jan 23, 2014, 9:28 pm

Use CO2 Measurement to meet Prereq Requirement

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Eric Tu  on 

Hello; Out BAS does not measure air flow (CFM), but, it does measure Return Air and OA C02 values. Can this PreReq be met using CO2 measurement (demand ventilation) rather than CFM?

1
Wed Mar 30, 2011, 5:51 pm

AHU measurements

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Luis Parada  on 

In our building we have two main AHU that supply 26 AHU (one for each floor of the building) and then we have VAVs for each zone in each floor. Do I need to perform measurements just in the two ma

1
Tue Dec 11, 2012, 7:37 pm