EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Guilherme Ramos on
Our building is fully occupied by the same company, so all the floors have similar open space layout, except for enclosed managers or small meeting rooms. There´s an outside air intake in each AHU
Minimum Ventilation Rate Compliance
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Kevin Aisawa on
Hello,
DOAS DCV Ventilation Requirements
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Kevin Aisawa on
Hello,
IEQp1 form - Selecting Critical Zones
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Madushan Samarakoon on
How to answer the following requirement in the IEQp1 form when you already filled the Minimum IEQ perfromance calculator with all occupiable zones in it and it has already automatically selected th
Demand Control Ventilation (DCV) Compliance Documentation?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Robert Pickering on
We are working on certifying a building that has demand-controlled ventilation (DCV), controlled by CO2 sensors.
ASHRAE 62MZ calculator
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Mark Frey on
I try to fill out the ASHRAE 62MZ calculator and have some problems with it: 1) We have lots of AHUs in our building (Some Vanitlation systems, some AC-systems and some are only exhaust systems).
Subtracting built-in furniture/casework from square footage
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by American University on
We've had a designer tell us that built-in furniture and case work (like a fan-coil unit enclosure) can be deducted from the square footage of a room when calculating the window opening requirement
Use CO2 Measurement to meet Prereq Requirement
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Eric Tu on
Hello; Out BAS does not measure air flow (CFM), but, it does measure Return Air and OA C02 values. Can this PreReq be met using CO2 measurement (demand ventilation) rather than CFM?
AHU measurements
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Luis Parada on