Forum quick links
Case2 Option 1- Labs
EBOM-2009 EAc1:Optimize Energy Performanceposted by Alicia Villanueva on
The project is an innovation center, it has offices (63%), laboratory (28%) and data center (8%), the lab represents more than 10% of the area, we have to use the USGBC Calculator Case 2 Option 1-
Scored High in Prerequisite
EBOM-2009 EAc1:Optimize Energy Performanceposted by Ryan Gardner on
Hello, my project recieved an Energy Star rating of 95 in the prerequisite stage. We have not identified any cost effetive ways to improve this number.
LEED EBOM EA1 Case 2C
EBOM-2009 EAc1:Optimize Energy Performanceposted by Magda Aghababyan on
I am working on a facility that cannot obtain an Energy Star score due to building type. I wish to use the Case 2 Option 2C using a set of comparable buildings.
Performance Period - Retrofits and Changes to # of Credits?
EBOM-2009 EAc1:Optimize Energy Performanceposted by Wendy Lao on
My building is aiming to be LEED EBOM Silver and received a preliminary audit from PG&E in 2011 which resulted in a score of 80 in Energy Star Portfolio (or 9 LEED points).
Energy Star shutdown
EBOM-2009 EAc1:Optimize Energy Performanceposted by Trista Brown on
Hi all Heads up that Energy Star's Portfolio Manager website will be completely unavailable from midnight June 26 through July 10!!
international project outside US
EBOM-2009 EAc1:Optimize Energy Performanceposted by Sofia Otterheim on
Hi all we are doing a international project outside US. when we started to prepare for this credit we used the energy star portfolio to get a rating for project building.
ENERGY STAR vs PIf3 Occupant Count
EBOM-2009 EAc1:Optimize Energy Performanceposted by Alexis Thompson on
Our project is currently pursuing LEED. We received an ENERGY STAR label for the 12-month period ending June 30th 2011 with a rating of 81.
LEED Offline Calculator Space Type Definitions/EUI's
EBOM-2009 EAc1:Optimize Energy Performanceposted by Joshua Peterson on
Is there a resource that further defines the activity space types as listed on the Case 2 LEED Offline Calculator and thier respective Source EUI's?