Forum quick links
Entryway mats stairs / staircase
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maya Karkour on
Our project has a staircase in front of the entrance. The clearance between the entrance and the stairs is less than 3 meters (about 1 meter).
MERV 13 filters
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by ethen mcmanus on
The third bullet of IEQ 5 states the following: In mechanically ventilated buildings, each ventilation system that supplies outdoor air shall comply with the following: – Particle filters or air c
Chemical Source in Garage
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Ricardo Sá on
Dear All,
I have a question regarding LEED v2009 NC IEQ C5 - Indoor Chemical and Pollutant Source Control.
Entryway mats at roof terraces/ gardens and emergency staircase
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by ebru unver on
Hello, For our office project, we are providing permanently installed grilles,on the floor at the 2 main entrances and at the car parking floor before the elevators hall. 1-Do we need also mats for
Roof deck entry mats?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Erica Downs on
There have been a lot of earlier threads on this, but they are old and there does not seem to a definitive answer provided yet.
How to Get this credit For VRF System
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by SAMY Chamy on
Hai:- Our project is sewing factory we already provide entryway mate and Exhaust as required, VRF system is used for A/c 1.Is it enough to attend this credit 2.
regularly used exterior entrance
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Erin Holdenried on
Has anyone come across a good definition of "regularly used exterior entrance"? Such as entrances used at least once a day or once a week?
"CHECK FORM" doesn't work at the bottom of template IEQc5
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by H M on
I am unable to "CHECK FORM" at the bottom of my template IEQc5 in LEED online. The text "Incomplete.
RE: Not Venting Copy Rooms Because of ASHRAE Interpretation IC 62.1-2007-25
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Joe Manganelli on
Hey All,
Recessed mats
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Heather Holdridge on
We are considering using a recessed coir walk-off mat for a LEED project. It will be recessed with a stainless border. Does this count as a roll-out mat and would require weekly maintenance?