Post a question or comment
Credit Filters
Minimum indoor air quality performance
Filter by location
Forum
Topic
Replies
Recent

Natatorium Locker Rooms

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Carl Karlen  on 

I am filing out the LEED documentation for IAQc1 for a Rec Center in St. Louis, MO. There is a Natatorium in this Rec with attached Locker/restroom/shower spaces.

0

Calculators for extraction

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Alicia Villanueva  on 

Do we have to provide calculators for exhaust-only systems? GH

1
Fri Apr 12, 2013, 4:54 pm

LEED Boundary

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  ABDUL MUTHALIB MOHAMED  on 

I am working on LEED boundary for Factory building. The factory has two buildings with common car parking but we are applying LEED certification for only building - 1.

1
Fri Nov 6, 2015, 1:22 pm

Exhaust-only ventilation?

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Laura Charlier  on 

Does anyone know if there is a LEED interpretation that allows exhaust-only ventilation in multifamily units under LEED-NC? Thanks!

1
Thu Apr 14, 2016, 3:42 pm
1
Thu Apr 29, 2010, 1:17 pm

ASHRAE 62.1-2007 Table 6-4 & GBCI Review

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Nathan Echtenkamp  on 

To date I have never received a comment from a reviewer regarding required exhaust per Table 6-4.

1
Tue Nov 12, 2013, 2:52 am

Natural ventilation calculations

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Charalampos Giannikopoulos  on 

Before the excel spreadsheet introduction naturally ventilated spaces were referenced in the IEQp1 form. Where can those spaces be referenced in the spreadsheet? Thank you!

1
Fri Jan 20, 2017, 3:59 pm

Alternative Compliance path for international projects

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Susann Geithner  on 

The USGBC has published a draft for additional guidance for international projects. That includes alternative compliance paths and even additional LEED online forms for international projects.

0

Guard house's ventilation

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Florian Schmidtchen  on 

Hallo all, We have a project in one Asian Country, where the Guard house (Gate house) is using a split type unit to condition the room, without mechanical fresh air intake.

1
Wed Jul 18, 2012, 1:05 am

Is APPENDIX Needed

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  ABDUL MUTHALIB MOHAMED  on 

In IEQp1 i already Upload 62MZcalc and Results from a Simulation Software and Fill the narrative Tab and all other but my check compliance is still indicate (Y) so my Doubt Whether we need to fi

0