Forum quick links
New calculator- cutsheets provided ?
NC-2009 MRc4:Recycled Contentposted by Ines Fischer on
Hi all!
I am new at the LEED community and I need some help.
I have downloaded the last materials calculator and I see there´s no space for cutsheets anymore.
Asphalt with Recycled content (RAP)
NC-2009 MRc4:Recycled Contentposted by Rick Alfandre on
Has anyone used Ashpalt with recycled asphalt? Reading the forums, it seems it will apply, but I'm having trouble determining what possible percentage of recycled content (pre or post consume
LEED User Concrete Tracking Form
NC-2009 MRc4:Recycled Contentposted by Melanie Blacklock on
Trying to use the LEED User Concrete Tracking Form for the first time to track fly ash. My question concerns Item I: Distances from both harvesting AND manufacturing point to project site (miles).
Rounding off the percentage to nearest whole number
NC-2009 MRc4:Recycled Contentposted by Vibha Pai on
I am working on the certification of a mixed use building and the recycled content used on the project is currently at 9.56%. Can it be rounded off to the nearest whole number a
MRc4 Calculator asks me for a password
NC-2009 MRc4:Recycled Contentposted by Monica Wilson on
Does anyone else experience this happening in their excel spreadsheet? I am able to download the 2009 calculator from the USGBC, and fill out info for MRc4.
New Wood vs Recycled Wood
NC-2009 MRc4:Recycled Contentposted by Bobby White on
Hi. Trying to understand this: Our company uses MDF in our products which claims 97% recycled content (all pre-consumer).
Recycled Content for differnet plants from the same manufacturer
NC-2009 MRc4:Recycled Contentposted by Elena Enache-Pommer on
Hypothetically, if Plant 1 has 15% pre-consumer recycle, Plant 2 has 25% and Plant 3 has 35%.
Cutsheets for steel products
NC-2009 MRc4:Recycled Contentposted by Raquel Clemente on
In our project it is possible to achieve 30% recycled content only considering the default 25% recycled content value for steel structural products. My question is if we must provide cutsheets for
Manufacturer Backup documentation
NC-2009 MRc4:Recycled Contentposted by Benoit Leclair on
Hi everyone,
I am wondering where I could find the justification for the following:
MR4, MR5 Credit Default Percentage For Unavailable Information
NC-2009 MRc4:Recycled Contentposted by Jack McCaskill on
The steel supplier for the structures contractor on our project has gone out of business and thus information regarding MR4 Recycled Content, and MR5 regional materials information is unavaila