Sub-metering Required?
NC-2009 EAc5:Measurement and Verificationposted by Dave Hubka on
Hello,
We typically implement Option D of IPMVP and calibrate the model once one-year of actual energy data is obtained.
Responsible party for preparing M&V plan
NC-2009 EAc5:Measurement and Verificationposted by Becky Dix on
What are the pros and cons of having either the MEP engineers or the CxA be responsible for documenting the M&V plan?
Confused by Third Party reporting tequirement of Option 3
NC-2009 EAc5:Measurement and Verificationposted by Renee Shirey on
I would love some insight on why, if going for Option 3, the whole-building water and energy usage data reporting MUST be done by a Third Party Data Source, vs. the actual Owner?
Cooling Tower Submetering
NC-2009 EAc5:Measurement and Verificationposted by Saju Varghese on
Under the reference guide, it is requiring for process water to be submetered, which according to the glossary involves cooling tower water, boilers and chillers, but if the cooling tower is servi
M&V Plan Doubt
NC-2009 EAc5:Measurement and Verificationposted by Marina Andrade on
Hi everyone, i'm studying the protocol of measurement & verification, and checked out some necessary points which must be in the plan but did not quite understand.
Highrise condo - What to monitor and meter
NC-2009 EAc5:Measurement and Verificationposted by Rob Hink on
With a 54 unit highrise condo, what would be acceptable to meter to meet the requirements of the credit. Individual unit electric meters?
Implementing the M&V Plan
NC-2009 EAc5:Measurement and Verificationposted by Eamon Geary on
I have a project seeking this credit where our MEP subconsultant is writing the M&V Plan and the Owner is implementing the M&V Plan.
"required" metered systems
NC-2009 EAc5:Measurement and Verificationposted by Florian Schmidtchen on
On this webpage in EAc5, I read that there are "Commonly metered systems", including lighting , motors, HVAC loads etc.