Forum quick links
Net metering with one meter or two
NC-2009 EAc2:On-Site Renewable Energyposted by Brian Leet on
Marcus, Our project is a campus which is pursuing a PPA.
EAC2 Form Definitions
NC-2009 EAc2:On-Site Renewable Energyposted by Robert Wichert on
The EAC2 Form asks for "Annual Renewable Energy Cost". I believe this is the SAVINGS from the renewable energy.
Battery Storage w/PVs...how does it impact points on EAc2, EAc1?
NC-2009 EAc2:On-Site Renewable Energyposted by Andrea Traber on
Electric battery storage is becoming cost effective in CA with our incentive programs and we are strongly considering it on a few projects, especially those with solar PV.
Renewable Energy question: BD+C
NC-2009 EAc2:On-Site Renewable Energyposted by Farah A. on
In order to achieve 3 pts in the On-Site Renewable Energy credit, what percentage of renewable energy must be provided in regard to the total energy consumption? 1.5% 6% 4.5% 3 % The answer given
Campus PV PPA
NC-2009 EAc2:On-Site Renewable Energyposted by Chad Coleman on
I am hoping that someone can shed some light on the way a Campus PV PPA will be viewed for EAc1 and EAc2 in LEED NCv2009.
District cooling PV array
NC-2009 EAc2:On-Site Renewable Energyposted by Katherine Ann Resurreccion on
If the project is district cooled with option 1 where the cooling energy consumption is determined by adding chilled water meter in the energy model for EAc1, in calculating the capacity of the PV
biofuel acquired from utility provider to serve CHP on site
NC-2009 EAc2:On-Site Renewable Energyposted by Doreen Kruschina on
Hi, we are working on a project that will implement a CHP unit serving a residential and a commercial development of which the commercial one being will be certified. Both projects are run by the s
Solar Array on LEED Building - But Not Property of Building
NC-2009 EAc2:On-Site Renewable Energyposted by Patty Lloyd on
I was wondering if anyone has had experience with this, and if this scenario can earn LEED points for on-site renewable energy.
PV energy on campus setting.
NC-2009 EAc2:On-Site Renewable Energyposted by Muhammad Faisal Azizullah Jaffar on
I am working on a campus project in Qatar with 3 buildings to be targeted for LEED Gold. 2 of those buildings are close to each other (Cluhouse and Academy).
On-site Fuel Cells
NC-2009 EAc2:On-Site Renewable Energyposted by Emilio Rovira on
Can we use on-site fuel cells as an ID Credit?