Basement Ventilation exceptional calculations
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
Our project has 4 basements with fresh air, exhaust and circulation fans.
DHW (Domestic Hot Water) as process load
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
It the project I'm modeling for LEED, the DHW is provided by several electric water heaters located in the the restroom zones. The modeling software is considering this as a stand alone base utilit
Baseline for retail
NC-2009 EAp2:Minimum Energy Performanceposted by Lise Dannesboe on
Hi! I know that there is a baseline for data centers (tool developed in excel), is there also a similar document or any guideline for retail?
90.1-2007 Addendum dn
NC-2009 EAp2:Minimum Energy Performanceposted by Sarah Gudeman on
Does anyone have experience modeling this for LEED EAp2/c1?
Utility entry in EAp2 Online form
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, In the project I'm working on there is water consumption due to open cooling tower operation.
Table 1.4.7A - Baseline Air-Side HVAC System Schedule
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The issue I'd request for advice and support is related to some reviewer's remarks. 1. It is for Supply Airflow. The baseline system is 5.
Exception b. of G3.1.1 and outdoor ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I’m modelling a System 5 for a baseline model. Exception b.
lighting schedule for school
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I’m modeling a school that is located in Italy, longitude 46°N.
Selection of HVAC Baseline System
NC-2009 EAp2:Minimum Energy Performanceposted by Praveenbabu Rajkumar on
Hi, Sorry for my English Any one can suggest, which is correct baseline HVAC system for following project description. No.
Exception b. of G3.1.1 and setpoint temperature
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Exception b. of G3.1.1 states: “use separate single-zone systems (..) for any spaces that have occupancy or process loads or schedule that differ significantly from the rest of the building”.