Energy Process

NC-2009 EAp2:Minimum Energy Performance
posted by  Nativa Architecture  on 

Shall we use LEED 2009 BD+C if the new building has 35% of energy process ? The main function is mechanical kneading without cooking process and warehouse.

2
Fri Apr 29, 2016, 2:34 pm

Cooling plant modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

In the project we are modeling the cooling plant which serves the production area and the buildings' HVAC systems is one and the same.

5
Fri Apr 29, 2016, 2:18 pm

District Energy System Guidance, Option 1

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Hello, I am modeling a district cooling system, since the HVAC system serves three buildings, including the one that is seeking LEED Certification.

3
Tue Apr 26, 2016, 12:17 pm

Additional floors of existing building

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

Our project is the major renovation of an existing building. We have added 2 new floors on the top. 1.

8
Default Avatar
ME Engineers Inc.
LEEDuser Basic Member
17 thumbs up
Mon Apr 25, 2016, 8:44 pm

DES Condenser Water System

NC-2009 EAp2:Minimum Energy Performance
posted by  Jake Torok  on 

We're working on a small project (7,500 SF) pursuing LEED NC v2009 designed with water-source VRFs served by a shared central condenser water system with cooling towers, boilers, and pumping.

4
Mon Apr 25, 2016, 4:39 pm

ventilation levels

NC-2009 EAp2:Minimum Energy Performance
posted by  Tristan Roberts  on 

I got this question via email and thought I would post it here for your help. Thanks!

4
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Thu Apr 21, 2016, 7:51 pm

Baseline HVAC for Major Renovation keeping existing chiller

NC-2009 EAp2:Minimum Energy Performance
posted by  Maria Isabel Conde  on 

Hi, we are working on a project for which our client would like to pursue a Major Renovation certification. All air handlers will be replaced.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Apr 18, 2016, 8:34 pm

Data center cooling

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

We have both space cooling and in rack chilled water cooling for computers. I wonder if the in-rack cooling is considered as process load or not.

3
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Tue Apr 12, 2016, 8:27 pm

air-cooled chiller condenser fans modeled separately?

NC-2009 EAp2:Minimum Energy Performance
posted by  Rob Pinkston  on 

Hello, Is it mandatory to break-out/model the condenser fans for an air-cooled chiller separately?

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Apr 12, 2016, 8:01 pm

EAP2 required HAP input summary

NC-2009 EAp2:Minimum Energy Performance
posted by  Eric Wright  on 

For the EAP2 upload EAP2-14 LEED is asking for the modeling software "input summary." What specific input summaries are required for Carrier HAP? I am modeling a building over 100,000 sq ft.

7
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Sat Apr 9, 2016, 10:20 pm