NC-2009 EAp2:Minimum Energy Performanceposted by Nativa Architecture on
Shall we use LEED 2009 BD+C if the new building has 35% of energy process ? The main function is mechanical kneading without cooking process and warehouse.
Cooling plant modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
In the project we are modeling the cooling plant which serves the production area and the buildings' HVAC systems is one and the same.
District Energy System Guidance, Option 1
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Hello, I am modeling a district cooling system, since the HVAC system serves three buildings, including the one that is seeking LEED Certification.
Additional floors of existing building
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
Our project is the major renovation of an existing building. We have added 2 new floors on the top. 1.
DES Condenser Water System
NC-2009 EAp2:Minimum Energy Performanceposted by Jake Torok on
We're working on a small project (7,500 SF) pursuing LEED NC v2009 designed with water-source VRFs served by a shared central condenser water system with cooling towers, boilers, and pumping.
ventilation levels
NC-2009 EAp2:Minimum Energy Performanceposted by Tristan Roberts on
I got this question via email and thought I would post it here for your help. Thanks!
Baseline HVAC for Major Renovation keeping existing chiller
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Isabel Conde on
Hi, we are working on a project for which our client would like to pursue a Major Renovation certification. All air handlers will be replaced.
Data center cooling
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have both space cooling and in rack chilled water cooling for computers. I wonder if the in-rack cooling is considered as process load or not.
air-cooled chiller condenser fans modeled separately?
NC-2009 EAp2:Minimum Energy Performanceposted by Rob Pinkston on
Hello, Is it mandatory to break-out/model the condenser fans for an air-cooled chiller separately?
EAP2 required HAP input summary
NC-2009 EAp2:Minimum Energy Performanceposted by Eric Wright on
For the EAP2 upload EAP2-14 LEED is asking for the modeling software "input summary." What specific input summaries are required for Carrier HAP? I am modeling a building over 100,000 sq ft.