Table 6.8.1 for air cooled liquid chillers
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, In the project we are modeling, on the plant level there are selected Air cooled chilled water chillers, which are also arranged to operate as Heat Pump water heating package (using the
Outdoor Pool
NC-2009 EAp2:Minimum Energy Performanceposted by Chet Knaup on
Hey, I have a Multi-Story Office building that is looking to achieve 19 points by purchasing PV Panels to offset the energy consumption.
Review comments on widow U-value
NC-2009 EAp2:Minimum Energy Performanceposted by Chris Miller on
We received the following review comments during our design review and my question is, where do I find the Uvalue for the frame & glass assembly mentioned in their comments(this is a storefront
CHP Usage
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear Sir:- we have Project in China it is a NC project We don't get Electricity from Government we use natural Gas Generator for Electricity Production.
District Central plant heating only
NC-2009 EAp2:Minimum Energy Performanceposted by Vipul Babriya on
I have a project with district steam from central plant for space heating only. The space cooling is provided by onsite using RTUs with Dx coil.
Natural Ventilation Loads Modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Sefa Sahin on
Dear All, We are working on residential building in Istanbul/Turkey. The building is heated and cooled by radiators and split AC respectively.
Baseline System configuration for mixed use condominium
NC-2009 EAp2:Minimum Energy Performanceposted by Jason Biondi on
We are working on a 10 story mixed use building consisting of approx.
40% WWR does it include the wall connected to other building?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I wonder if the wall is directly connected to adjacent building ,should we include them in the window to wall calculation?
Outdoor Air Intake: Baseline vs. Proposed
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
We are currently working on a LEED project whose Baseline Building will have an HVAC system 5 installed.
Motor Efficiencies for projects outside the US
NC-2009 EAp2:Minimum Energy Performanceposted by eirini matsouki on
I was wondering whether anyone has come across the motor efficiency issue for projects outside the US.