Does a Party wall count for the Window to wall ratio?
NC-2009 EAp2:Minimum Energy Performanceposted by Zonda E. Team on
Hi there, Im modelling a corner building, which has two adjacent buildings so only the façades facing the street are in contact with the exterior environment.
IES ApacheHVAC - Proposed system for VRF
NC-2009 EAp2:Minimum Energy Performanceposted by Alice chen on
Hi All, I am modelling a VRF system using ApacheHVAC in IES. But have no idea which prototype to choose.
Crawlspace and Attic Classification
NC-2009 EAp2:Minimum Energy Performanceposted by Joseph Chappell on
I am working on an existing building renovation where there is a significant amount of building floor area that is crawlspace and attic area.
24-hour lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Bill Swanson on
I looked thru all 2000+ comments and didn't see this addressed. I have a hotel project with a pool, fitness room, vending/ice machines, ect.
EAp2-7 Example Spreadsheet
NC-2009 EAp2:Minimum Energy Performanceposted by AAME User on
Can anyone point me towards an EAp2-7 example spreadsheet filled out complete for reference?
Proposed Vs Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
My proposed case VAV does not have parallel fan power boxes.
thermal blocks & HVAC zones
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
Hello, I´ve a question about thermal zonification in my energetic model. I use Energy+ and my proposed HVAC system is Geothermal Heat Pump, AHUs for ventilation requeriments, Fan-Coils and Radian
Process Loads in LEEDOnline Form
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Dear all, I need to know if anyone did experience that before.
Air Economizer Requirement
NC-2009 EAp2:Minimum Energy Performanceposted by Rock Ridolfi on
The owner would like to eliminate economizers on a few of the air handlers.