BASELINE - Fan Power adjustment
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, In the design project we are modeling, there are systems which In the Baseline model are to be classified to System 9, System 11 (90.1-3013 for Data Centers) and Parking garage ventilat
Square feet calculation
NC-2009 EAp2:Minimum Energy Performanceposted by LORENZO ORSENIGO on
Hello, we are working on a project LEED C&S in 2009 of approximately 100,000 square feet. The property doesn't want to implement the energy modeling due to economic issues. Since the project is
Chiller Minimum Equipment Efficiency nonstandard conditions
NC-2009 EAp2:Minimum Energy Performanceposted by Adriana Hansen on
The project team has specified a centrifugal chiller of over 600 Tons with a nonstandard conditions. It has been sent an AHRI certificate showing the compliance with ASHREA 90.1-2007 and 2010.
Service Hot Water Efficiency Proposed vs. Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Paul Bohres on
How do you account for the difference in service hot water efficiency from the proposed design to the baseline design if the proposed design is using electric point-of-use water heaters?
Is waste heat district energy?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have a project that use heat recovery chiller to recovery heat from the waste heat from a nearby data center.
Energy Modeling and LEED
NC-2009 EAp2:Minimum Energy Performanceposted by Lisa Abraham on
We are creating a Revit model using Revit 2014. Going for LEED2009, (ASHRAE 90.1-2007). Do we need two models? Thinking of bringing model into eQUEST. Is that necessary to determine baseline vs.
ASHRAE mandatory provisions for existing building
NC-2009 EAp2:Minimum Energy Performanceposted by Wei Jiang on
Our project is a major renovation project. Do the ASHRAE mandatory provisions apply to existing systems/components that are not altered?
Zone Isolation (HVAC 6.4.3.3.4)
NC-2009 EAp2:Minimum Energy Performanceposted by Alex Parella on
Our office building (Major Renovation v3 2009), located at 3C climatic zone, doesn’t exceed 25,000 ft2 of conditioned floor area, but has more than one floor. Different users will have their own s
ASHRAE STANDARDS 90.1 Appendix G - Humidity Controls
NC-2009 EAp2:Minimum Energy Performanceposted by Curtis Clark on
Appendix G does not address humidity controls.
SHGC of a double skin curtain wall
NC-2009 EAp2:Minimum Energy Performanceposted by Chaan Ah Bahk on
Hi All, I'm working on a project building with double skin facade, and this double skin facade system is equipped with an automatic shading device in the cavity space between the glazings.