Post a question or comment
Credit Filters
Minimum energy performance
Filter by location
Forum
Topic
Replies
Recent

EAp2 Labeling Mechanical Equipment

NC-2009 EAp2:Minimum energy performance
posted by  Ian McCall  on 

Hello, Fact or Fiction: For EAp2 ASHRAE 90.1 §6.4.1.5.1 all mechanical Equipment must have a Label installed by the manufacturer stating that the equipment complies with the requirements of Standa

1
Fri Mar 7, 2014, 6:08 pm
1
Wed Dec 17, 2014, 3:15 pm

Solar Tubes in Energy Pro

NC-2009 EAp2:Minimum energy performance
posted by  Logan Dorrell  on 

How would we model a solar tube light fixture in Energy Pro Software? We want to get the light thru it, but not the heat.

1
Thu Oct 1, 2015, 4:43 pm

Mandatory Provitions - Fenestration and Doors

NC-2009 EAp2:Minimum energy performance
posted by  Paula Hernandez  on 

Hi, I have an air conditioned warehouse, where wine will be sotored, and it has two doors, with now vestibules.

1
Thu Mar 15, 2012, 8:52 pm

Rennovation with small addition

NC-2009 EAp2:Minimum energy performance
posted by  Stephanei Mezynski  on 

I am working on a project that is 15,00 sqft renovation and 8,000 sqft new construction (addition).

1
Tue Jul 19, 2016, 3:13 pm

Baseline System Selection - larger heated space - smaller cooled

NC-2009 EAp2:Minimum energy performance
posted by  Don Carsto  on 

Our case involves 16,000 sqft of cooled and heated space and 90,000 sqft of heated-only space. The two spaces happen to be separated by a 4-hour fire wall.

1
Tue Dec 11, 2012, 2:46 pm

Baseline DCV modeling

NC-2009 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings, The following issue is somehow not clear and any support is highly appreciated. The project belongs to system 7 (LEEDv2009) and has to be modeled with one AHU system per floor.

1
Thu Jul 13, 2017, 3:07 pm

Reuse of process equipment

NC-2009 EAp2:Minimum energy performance
posted by  LEED Pro Consultant  on 

Hello everyone, We are working on an industrial facility project, in this case the process loads represent a 60-70% aprox. The intent of the client is to bring equipment from another plant and r

1
Sat Apr 26, 2014, 12:18 am
1
Mon Jan 3, 2011, 3:31 pm

ASHRAE Standard for exterior lighting

NC-2009 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

I am filling in v2009_Minimum Energy Performance Calculator_v09 (LEED v.9) It seems that for the calculation of the baseline power for the exterior lighting the Minimum Energy Performance Calculat

1
Thu Aug 31, 2017, 2:57 pm