How to include Parking Ramp Energy Use in Small Bldg?
NC-2009 EAp2:Minimum energy performanceposted by Kevin Flynn on
I have just begun working on a project that features a small (under 20,000sf) office building on a large public plaza on top of a below grade parking ramp.
Energy Update ballot
NC-2009 EAp2:Minimum energy performanceposted by Kathryn West on
when will the results of the ballot be posted?
Unitary Cooling Efficiencies
NC-2009 EAp2:Minimum energy performanceposted by TOMAS URIBE on
Hello, We are simulating a type 4 system in our baseline and need to know if the efficiency ratings specified in table 6.8.1B (and tables 6.8.1.A, 6.8.1D) do include supply fan power and hence ne
Change form
NC-2009 EAp2:Minimum energy performanceposted by Nicolas Martinez Ochoa on
Hi, I am working in an office building. I have completed the “minimum energy performance v2009” spreadsheet, but the project uses the v05 form. Is it possible to change the form to a newer form?
Zone isolation
NC-2009 EAp2:Minimum energy performanceposted by Ricardo Sá on
In an office building, shall meeting rooms (sporadically occupied within the schedule defined for the remaining occupied office areas) be considered an isolation zone according to ASHRAE 90.1 (2007
Energy Model Baseline for a Dome
NC-2009 EAp2:Minimum energy performanceposted by Nelina Loiselle on
We have a data center project where the owner decided to design-build a dome structure because of the efficiencies inherent in this type of construction.
Denial of EA PR2
NC-2009 EAp2:Minimum energy performanceposted by Roxanne Button on
A client has asked for my advice in appealing the denial of PR2. I've taken a quick look at the review comments but will be digging deeper into it in the next couple of days.
Basecase Building Envelope
NC-2009 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear All:- we have two major renovated Building in India Building 01. No change in building envelope (used the existing wall, floor, window) but changes in whole MEP Design Building 02.
Major Renovation Requirements
NC-2009 EAp2:Minimum energy performanceposted by Saju Varghese on
When a project would be classified under Major Renovation (our project is around 80% renovated) for the energy model, does the baseline have to be the same as Ashrae 90.1 envelope requirements or c
Radiant tube
NC-2009 EAp2:Minimum energy performanceposted by LEEDme Lorenzi on
A radiant tube gas can be associated with the table 6.8.1E ASHRAE 2007?