NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
If a project is being demolished but the slab and some columns are being kept, would that be considered a major renovation since we are not given the option of redesigning the orientation of the bu
Laboratories - Appendix G Baseline System
NC-2009 EAp2:Minimum Energy Performanceposted by Adam Judge on
G3.1.1, Exception "d" requires laboratory spaces with a minimum of 5000 cfm of exhaust to use a baseline system type 5 or 7 that reduce the exhaust and makeup air volume to 50% of design values dur
additional heating system
NC-2009 EAp2:Minimum Energy Performanceposted by Alfonzo Collins on
I am working on a high-rise residential building with VRF. The building envelope is heavily glass, so the owner has decided to also install a hydronic heating system at the building perimeter.
Brewery Process Load - Baseline and Proposed Case Set-up
NC-2009 EAp2:Minimum Energy Performanceposted by Xun Jia on
The brewery I am modeling has large percentage of energy consumption associated with the process load.
Energy Recovery for Baseline Air Handling Units (LEED 2009)
NC-2009 EAp2:Minimum Energy Performanceposted by Craig Hossfeld on
My proposed design has multiple AHUs supplied from a dedicated outside air AHU (DOAS) . The DOAS will be over 20,000 cfm and will have energy recovery.
Does a Party wall count for the Window to wall ratio?
NC-2009 EAp2:Minimum Energy Performanceposted by Zonda E. Team on
Hi there, Im modelling a corner building, which has two adjacent buildings so only the façades facing the street are in contact with the exterior environment.
IES ApacheHVAC - Proposed system for VRF
NC-2009 EAp2:Minimum Energy Performanceposted by Alice chen on
Hi All, I am modelling a VRF system using ApacheHVAC in IES. But have no idea which prototype to choose.
Crawlspace and Attic Classification
NC-2009 EAp2:Minimum Energy Performanceposted by Joseph Chappell on
I am working on an existing building renovation where there is a significant amount of building floor area that is crawlspace and attic area.
24-hour lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Bill Swanson on
I looked thru all 2000+ comments and didn't see this addressed. I have a hotel project with a pool, fitness room, vending/ice machines, ect.
Window to wall ratio
NC-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
I’m working on project with two mid-rise buildings, one for the office and the other is for parking garage mostly are naturally ventilated.