ERV supply and return fans
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
We have grouped many conditioned zones which the OA will be supplied with central DOA and ERV system. The air from the ERV will be deliver by large fan and return by also a large fan.
Decorative lighting vs. interior lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
We are attempting a certification of an art center under the LEED NC-2009 and we have the following question: - architecture design team is considering including a decorative feature for a special
Feature lights
NC-2009 EAp2:Minimum Energy Performanceposted by Phillip Cook on
We have some external uplights that are used to light statues from below.
LEED NC 2009 for factory building
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
The project is a manufacturing facility. The main production block has other adjacent buildings such as admin, canteen, health center, utility and security blocks.
Simple simulation question
NC-2009 EAp2:Minimum Energy Performanceposted by Timo Marquez on
This might be a rather simple question, but would like avoid confusion.
Energy Recovery in baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
G3.1.2.10 says ER is needed when design cfm >5000 and more than 70% OA. I wonder does this mean the proposed or baseline design cfm? Our proposed design uses chilled-beam w/100% OA in the DOAS.
Where do I upload the response report for Design Final Package ?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Dem on
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.
Lighting,people, and equipment diversity.
NC-2009 EAp2:Minimum Energy Performanceposted by Eric Wright on
I am modelling a large multi use building where the peak occupancy never rises above ~70%. Different areas of the building are used on different days but never all at once.
Major renovation, model rotation
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
If a project is being demolished but the slab and some columns are being kept, would that be considered a major renovation since we are not given the option of redesigning the orientation of the bu
Laboratories - Appendix G Baseline System
NC-2009 EAp2:Minimum Energy Performanceposted by Adam Judge on
G3.1.1, Exception "d" requires laboratory spaces with a minimum of 5000 cfm of exhaust to use a baseline system type 5 or 7 that reduce the exhaust and makeup air volume to 50% of design values dur