Simple simulation question
NC-2009 EAp2:Minimum Energy Performanceposted by Timo Marquez on
This might be a rather simple question, but would like avoid confusion.
Energy Recovery in baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
G3.1.2.10 says ER is needed when design cfm >5000 and more than 70% OA. I wonder does this mean the proposed or baseline design cfm? Our proposed design uses chilled-beam w/100% OA in the DOAS.
Mandatory Provisions
NC-2009 EAp2:Minimum Energy Performanceposted by Diego Escalona on
Hello All, I have two questions about compliance with the mandatory provision: 1) Only the main air conditioning system should be evaluated with the tables in chapter 6?
Basecase Building Envelope
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Our project is G+3 factory building and it is a major renovation and we are renovated wall, window, HVAC equipment and we consider ASHRAE 90.1.2007 Building envelope for base case & renovated
Lighting,people, and equipment diversity.
NC-2009 EAp2:Minimum Energy Performanceposted by Eric Wright on
I am modelling a large multi use building where the peak occupancy never rises above ~70%. Different areas of the building are used on different days but never all at once.
Major renovation, model rotation
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
If a project is being demolished but the slab and some columns are being kept, would that be considered a major renovation since we are not given the option of redesigning the orientation of the bu
Laboratories - Appendix G Baseline System
NC-2009 EAp2:Minimum Energy Performanceposted by Adam Judge on
G3.1.1, Exception "d" requires laboratory spaces with a minimum of 5000 cfm of exhaust to use a baseline system type 5 or 7 that reduce the exhaust and makeup air volume to 50% of design values dur
n/a
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
G3.1.2.5 states: Ventilation.
Baseline system for hybrid service hot water system
NC-2009 EAp2:Minimum Energy Performanceposted by Vernon Smith on
Our Proposed project (LEED 2009 NC) has a hybrid service hot water system that uses a water-source heat pump as the primary hot water generator and has a heat exchanger as a backup downstream of t
Instantenous electric water heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Adam Rustige on
Hello, The model I'm working on has instant electric water heaters, per 90.1 7.4.2 Equipment Efficiency, "Equipment not listed in Table 7.8 has no minimum performance requirements." Electr