Water-cooled screw chiller- Minimum Efficiency
NC-2009 EAp2:Minimum Energy Performanceposted by Arub Vijay on
Hi, I would like to seek expert advice in the following. 1) Can anybody advise if water-cooled screw chillers intended to operate at non-standard conditions (Middle East) must comply with Table 6.
Hotel occupancy rate and a/c energy consumption
NC-2009 EAp2:Minimum Energy Performanceposted by Orlin Velinov, PE on
We have a hotel project with VRF systems serving the guest rooms. I am struggling with coming up with a way to simulate less than 100% occupancy rate in the hotel guest rooms.
EAp2 -3 Energy Type Summary
NC-2009 EAp2:Minimum Energy Performanceposted by alisa gilfillan on
I need help on what numbers to use in this table.
Utility Service Changed During Construction
NC-2009 EAp2:Minimum Energy Performanceposted by Candice Rogers on
Hello - My project submitted, and received approval, of our energy model based on natural gas DHW heating and everything else electric.
Standard baseline for each piece of medical equipment
NC-2009 EAp2:Minimum Energy Performanceposted by James Chueh on
I am building a model for healthcare project and trying to save energy use as much as possible, but the energy use of medical equipment is huge.
Building Simulation for a non AC Facility
NC-2009 EAp2:Minimum Energy Performanceposted by Udana Ratnayake on
We are working in a Garment Factory project in Sri Lanka where the facility is to be LEED certified. Whole building will be put up as a non air conditioned facility.
Baseline HVAC system and envelope for hospital patient rooms
NC-2009 EAp2:Minimum Energy Performanceposted by Mark Benson on
I'm not sure of the Baseline envelope and HVAC system to use in hospital patient rooms. For one, Section 3.2 defines "residential" as including patient rooms in hospitals.
Existing Building undergoing major renovation
NC-2009 EAp2:Minimum Energy Performanceposted by thomas beal on
ASHRAE 90.1 states that existing buildings shall be modeled as is before renovations. Currently the building has all of the window openings boarded up.
LEED NC rating for Non AC buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Sundararaj Subburaman on
I need expert advise on handling non AC building (naturally ventilated) for applying for LEED NC rating system.
Including Mezzanines in the Energy Model
NC-2009 EAp2:Minimum Energy Performanceposted by Kellie Hollenbeck on
We are clear that for the total Gross Floor Area we have to include mezzanines.