FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

EAp2 -3 Energy Type Summary

I need help on what numbers to use in this table. I keep getting an error message, too, that says: " If revising the values in Table EAp2-3, reselect energy type in all affected rows in Table EAp2-4 and Table EA[2-5 to ensure that the revised values . . . are propgated and refreshed. I went through those tables and reselected each energy source. I am still getting the error message. I have erased it all and put it all in new and I still get that error message! What am I doing wrong?

6

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 01/26/2012 - 19:37

My Engineer is getting the same response. And everything is filled out? Anyone else have this issue/error message. No fields are red only the following text: If revising the values in Table EAp2-3, reselect energy type in all affected rows in Table EAp2-4 and Table EAp2-5 to ensure that the revised values from Table EAp2-3 are propogated and that Table EAp2-4 and Table EAp2-5 calculations are refreshed.

Thu, 01/26/2012 - 19:46

We are getting the same error. It's very frustrating. We have been told that it may just be a glitch in the version. We plan to go ahead and submit it with this error anyway. Please post if you are able to fix it. We spent a week or more trying to remedy this with no luck.

Thu, 01/26/2012 - 19:52

As long as Tables EAp2-4 and EAp2-5 are adding to the correct totals then ignore the warning. Make sure the totals in these tables match the summary output reports from the simulation results as the reviewer will check that if they see the error message.