VAV FAN POWER BOX MODELING
NC-2009 EAp2:Minimum Energy Performanceposted by HOUCINE TLEMSANI on
I am working on a project where the base line hvac system is type 6 VAV with fan power boxes.
Solar subsidy vs grant
NC-2009 EAp2:Minimum Energy Performanceposted by Tyra Sorensen on
We have a project that received a large grant from the state to put on Solar panels.
Building Configurations
NC-2009 EAp2:Minimum Energy Performanceposted by Andrew Dasso on
I am working on a project with a limited site. The proposed building (six story hotel) has a distinct size that only fits on the site one way.
Documentation of Natural Ventilation in PDF Template
NC-2009 EAp2:Minimum Energy Performanceposted by Marco Abdallah on
We have modelled our building which is equipped with hydronic heating and natural ventilation (no cooling) according to App D of the Advanced Energy Modelling Guide v2.0.
F-factor of slab for Proposed Design
NC-2009 EAp2:Minimum Energy Performanceposted by Alicia Villanueva on
Dear alll, From a preliminary review, we received a comment regarding the Energy Modeling saying that the slab on grade floor of the proposed should be modeled using a F-factor, and not using the
GLP vs. Natural Gas
NC-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
Does LEED make a difference between GLP and Natural Gas? EAp2 template contemplates natural gas and electricity but we have showers that use GLP for domestic water heating.
Energy Model Software
NC-2009 EAp2:Minimum Energy Performanceposted by Pat Thomas on
I was just told by someone who 'used to work for USGBC' that use of eQuest requires prior approval, project by project ?? Does this make any sense to you ??
Double skin facade model
NC-2009 EAp2:Minimum Energy Performanceposted by Florent Fabre on
Hi all, I’m working on a LEED certification on an office building with a double skin facade.
Semiheated Walls
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
I've interpreted the semiheated column in table 5.5-1 refering to the external walls of a semiheated space...as this table is much conserned with the envelope (the partition between the semiheated
Exterior lighting vs. LPB
NC-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
We have a multiple building Project and the LEED Project Boundary of the 4 buildings to be certified do not sum up to be equal do the LEED Campus Boundary, which is according with AGMBC 2010 page 9