Electric Instantaneous water heater

NC-2009 EAp2:Minimum Energy Performance
posted by  CT G  on 

Hi, The design team is specifying an electric instantaneous water heater on a project we are working with.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jun 4, 2014, 3:57 pm

Lighting Power Density-Multiple Bldg Types within one building

NC-2009 EAp2:Minimum Energy Performance
posted by  Rebekah Burke  on 

Our Multipurpose Building is a new NCAA Division II, national broadcast basketball, academic, and exercise center for the campus.

3
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Fri May 23, 2014, 5:03 pm

Kitchen Make-up air unit

NC-2009 EAp2:Minimum Energy Performance
posted by  Anil Bhari  on 

Is Make-up air unit considered as process load? Since kitchen has its own cooling and heating system.

11
Fri May 23, 2014, 4:55 pm

Choosing an HVAC system baseline for a Manufacturing Facility

NC-2009 EAp2:Minimum Energy Performance
posted by  Ashwin Kumar  on 

We are working on a manufacturing facility for which we are trying to choose the accurate HVAC baseline system for energy modelling. According to ASHRAE 90.1 2007 Table G.3.1.1A, looking at our co

3
Default Avatar
Sustainability Services Consultant
M+W Group
LEEDuser Basic Member
2 thumbs up
Thu May 15, 2014, 1:25 pm

district heat pumps

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

Two buildings (“building A” and “building B”) are on adjacent sites. The project team wants to achieve two different LEED NC certifications.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 7, 2014, 9:57 pm

Process outside buildings

NC-2009 EAp2:Minimum Energy Performance
posted by  LEED Pro Consultant  on 

Hello, Regarding a campus project: We have several buildings (11 small ones) within one campus and several processes going on within the campus, but outside of any building.

3
Wed May 7, 2014, 2:34 pm

Baseline Model DCV

NC-2009 EAp2:Minimum Energy Performance
posted by  Laura Long  on 

I overlooked the demand control requirement for the baseline system in the energy model, and have been directed by the reviewer to install it in 3 rooms based on calculation numbers, which makes se

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue May 6, 2014, 2:37 pm

Modelling Basement Parking

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

I'am modelling a building with 2 levels of underground parking, which is unconditioned, opened to the outdoor, and having 4 fans (2 supply and 2 exhaust), while the exhaust fans are DCV's based on

9
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Apr 30, 2014, 1:37 pm

Oversizing the Proposed Case

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

I need to know if both; Basecase and Proposed case should be identical meaning that both should be oversized with the same ratio?

2
Executive Director
Empirical Energy Solutions
LEEDuser Basic Member
23 thumbs up
Thu Apr 24, 2014, 6:07 pm

Window Ventilation in Multifamily Residential unit

NC-2009 EAp2:Minimum Energy Performance
posted by  Erika Duran  on 

We received the following comment from USGBC: "...The project uses natural ventilation for some bedrooms in the Proposed design and exhaust fans to induce ventilation air into the dwelling units.

12
Default Avatar
Mechanical Engineer
Miami Dade County
LEEDuser Basic Member
2 thumbs up
Wed Apr 9, 2014, 9:08 pm