Demand Control Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
Further, to the preliminary review of EAp2 our project team got a comment with regard to demand control ventilation (DCV).
Baseline system(s) for mixed use building?
NC-2009 EAp2:Minimum Energy Performanceposted by Erin Holdenried on
We have a project that consists of 1 level of retail, 7 levels of above grade parking, 8 levels of commercial office space, and 16 levels of residential (apartment) space.
reference systems for a warehouse building
NC-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
We are working on a warehouse project with small attached administration building. I have a question regarding reference systems for this project.
Modeling a manufacturing building
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Hi, I'm modeling a manufacturing plant. The issues I'm looking for advises are related to modeling the manufacturing process and specifically: Cooling.
Continuous insulation - Interrupted by slab vs truly continuous
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, I am modeling a masonry building.
LEED NC 2009 for factory buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
The project is a manufacturing facility with ancillary buildings such as admin, health centre, canteen, utility and security blocks. The buildings are not physically connected to each other.
Energy Modeling for Casino
NC-2009 EAp2:Minimum Energy Performanceposted by Chris Hammett on
Hello. I am working on the energy model for a casino/hotel/nightclub. I have been contracted only to develop the model, no input in regards to design.
Baseline Fan Power Heat Recovery
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
I have a few questions on baseline fan power taking credit for heat recovery in the proposed building. 1.
Modeling a humidifier in the baseline case
NC-2009 EAp2:Minimum Energy Performanceposted by Gustav Alfaro on
Hi, I am working on a data center project under NC 2009.
Glazing ratio
NC-2009 EAp2:Minimum Energy Performanceposted by CT G on
We are working with a building that has 9 floors, the first 6 floors are for parking, unconditioned naturally ventilated with no glass on the envelope, and the last 3 are conditioned office spaces