Commissioning for overseas projects
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Natalie Tan on
Hi, we have a small USGBC LEED-NC project (400m2) in Kuwait where the Owner wants us (LEED Consultancy firm in Canada) to hire a commissioning agent (as the "brain") in canada to oversee the commis
Commissioning of a factory machine
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Jatuwat Varodompun on
Does it need to include Machines (to produce goods) in the scope LEED CxA?
Multi-family Mid-rise EA Pre-req 1 - Option 2
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Pournamasi Rath on
Hi, I have a quick question regarding LEED for Homes Multi-family Mid-rise EA Pre-req 1 - Option 2 (see reference document here - http://www.usgbc.org/sites/default/files/Energy%20and%20Atmosphere%
On-site, third party owned solar
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Nicholas Bristow on
Our project has an on-site, third party owned Solar PV system.
Sample LEED 2009 Basis of Design Document
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Robert Shields on
I have a sample Basis of Design document that applies to LEED 2.2. Not sure if there are any differences in the requirements for the document required in LEED 2009.
Cx for LEED V4
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Anton Paley on
Great flowchart on Cx for V3. Got one for V4?