Hello,
I'm looking into the difference between Healthcare and New Construction Fundamental Commissioning for a project but I have not been able to find anything related to that. Can you help me find this information?
Forum discussion
NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
Hello,
I'm looking into the difference between Healthcare and New Construction Fundamental Commissioning for a project but I have not been able to find anything related to that. Can you help me find this information?
LEEDuser is supported by our premium members, not by advertisers.
Go premium forTo post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.
Scott Bowman
LEED FellowIntegrated Design + Energy Advisors, LLC
LEEDuser Expert
519 thumbs up
April 26, 2014 - 10:20 am
You need to purchase the HC Supplemental Guide for v2009, and it has specific information that is either changed or different for HC.
Under EAc1, there really is no difference for Fundamental. There is some language encouraging expanding the scope to include the complex and critical systems that are typical for this kind of building, which we encourage as well. They do not mention the electrical and emergency power systems, and we have found that is super critical in a hospital…we recommend doing black out tests before opening as the only real way to know that everything is doing what it is supposed to.
The big change for v2009 and HC is in EAc3, Enhanced. This is the first introduction to envelope commissioning that is now included in v4. In this case you must do the building systems portion, then you can get an additional point for envelope. In my opinion, and we do not offer the service so this is not self-serving, envelope commissioning is incredibly important and should be used on all projects!