Forum quick links
Preschool Occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by Heather Holdridge on
I received a preliminary design phase review comment on a preschool project for this PI form. We entered identical values for the peak and average transient occupancy because the building is
Occupants for Multi-purpose Hall and Canteen
NC-2009 PIf3:Occupant and Usage Dataposted by Sjansie Lachica on
My project is a mixed-use building which consist a whole floor assigned as multi-purpose hall and another floor as canteen. Do we need to determine the number of occupants in multi-purpose hall?
Regularly Occupied Area - Kitchen Countertops and Islands
NC-2009 PIf3:Occupant and Usage Dataposted by Rose Winter on
I know that residential kitchens are considered regularly occupied.
NC-2009 PIf3 - Occupant and Usage Data
NC-2009 PIf3:Occupant and Usage Dataposted by Felicia Ridgeway on
My new construction administrative office building project (federal project on a secure military base) has 750 full-time occupants (8 hour work day), 300 part-time occupants (4 hour work day), and
Calculating F.T.E. for a police substation
NC-2009 PIf3:Occupant and Usage Dataposted by Joe Malone on
We are working on a police substation that houses two precincts with three shifts per precinct.
Gross area v. net area in PI Form 3 and IEQ8.1
NC-2009 PIf3:Occupant and Usage Dataposted by James Bell on
PI Form 3 requires gross area of Occupied Space.
Calculating staff and transients for Airport
NC-2009 PIf3:Occupant and Usage Dataposted by Jos Schild on
For the (re)design of an airport I'm looking for a way to calculate the FTE's and transients for the passenger terminal. The building has low rates of FTE and high rates of transients (visitors).
LEED v2009 NC Total Daily Occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by A Commings on
I have a residential dormitory project with some questions on Table Plf3-3 Total Daily Occupancy.
Total project users as a daily average
NC-2009 PIf3:Occupant and Usage Dataposted by Dave Hubka on
Project Information form #3 version 06 requires the project team to list the 'total project users as a daily average'.
Does anyone know which credit this links to?