Forum quick links
Building Footprint in mixed used building
NC-2009 PIf2:Project Summary Detailsposted by Victoria Rios Esteve on
Hi everyone,
Project boundary
NC-2009 PIf2:Project Summary Detailsposted by Nick Toon on
Hi, we are building an airport under new construction (2009).
Changing Total Gross Floor Area in PIf2 during Preliminary Design Review
NC-2009 PIf2:Project Summary Detailsposted by Edgar Arevalo on
I'm currently going through the preliminary design review credits, and I was stumped on the comment for IEQp1: Minimum Indoor Air Quality Performance surrounding the 40,198 sq. ft.
Change LEED boundary after Design Review?
NC-2009 PIf2:Project Summary Detailsposted by Joyce Kelly on
LEED boundary encompassing 130 acres was established by Civil to include all stormwater treatment. Following Prelim.
Existing Building Fire Escapes - Building Square-footage
NC-2009 PIf2:Project Summary Detailsposted by Katherine Norris on
Our existing building relies on (2) metal fire escapes for emergency egress that we are not modifying. They are full exterior, self supported, and only connect to the building with later
PI Form 2 Estimated project budget
NC-2009 PIf2:Project Summary Detailsposted by Brian Durgin on
Our project consist of multiple buildings on a large site, well our LEED Boundary only includes the main building and surrounding site area.
Emergency Generator
NC-2009 PIf2:Project Summary Detailsposted by Nicole Kimoto on
In our new facility we have an emergency generator that runs on diesel.
Parking Area Square Footage
NC-2009 PIf2:Project Summary Detailsposted by Jim Pugh on
With respect to calculating the "Square footage of all parking areas" . . .
Reapplying for credits
NC-2009 PIf2:Project Summary Detailsposted by jupiter luner on
We're getting ready to move onto construction phase.
LEED scope of two Separate Buildings sharing a Parking Structure.
NC-2009 PIf2:Project Summary Detailsposted by Adrian Arenas on
Hello All,