Forum quick links
Total Materials Cost vs Total Value of Sustainable Materials Cost
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Chloe Naese on
Hi everyone, I was wondering what the difference is between the "Total Materials Cost" and "Total Value of Sustainable Materials Costs (unweighted)" in the BPDO calculator?
Post-industrial recycled content: Can off-spec or expired product count as recycled content
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Mickel Maal on
Hi,
Do materials in building services count as 'permanently installed'?
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Cecilia Lopez-Cotarelo on
Do the materials used in the building services count a permanently installed materials when calculating the costs?
Bonus for hyper-local sourcing
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Kim Shinn on
I have a question about the “bonus” for hyper-local sourcing. The credit requirement now reads (with the highlight emphasis by me):
Sustainable Forestry Initiative
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by John Masters on
Does wood which is certified under the Sustainable Forestry Initiative program qualify as contributing toward the BPDO "Sourcing of Raw Materials" point?, or - does only FSC wood count toward this?
Plant-based Oil in Terrazzo bio-based?
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by J Schütz on
Dear all,
I'm unsure if a plant-based oil in a terrazzo counts as bio-based and which documentation would be needed. Can someone share thier experience with the bio-based requirements?
Sourcing of Raw Materials: Leadership Extraction Practices
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Ayman Raouf on
Is it allowed for an individual product to meet multiple Leadership Extraction Practices simulatenously but separately for each component of a product?
Is Sustainable Forestry Initiative (SFI) a USGBC Equivalent to FSC wood
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Summer Gorder on
Has Sustainable Forestry Initiative (SFI) been approved as USGBC Equivalent to FSC wood
What are Division 1 general requirements of the project specifications
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Ayman Raouf on
Can someone explain to me what are Division 1 general requirements of the project specifications?
Here are some extracts I can read: