Forum quick links
LEED baseline model with proposed increased ventilation and pressurization
NC-v4.1 EAp2:Minimum Energy Performanceposted by Moses Chong on
Has any one worked on LEED project that includes increased ventilation credit AND the project has an pressurization-based ventilation rate? What should I do with the baseline model?
Justification of usign the 9.6.2 Additional Power lighting in the Baseline Model
NC-v4.1 EAp2:Minimum Energy Performanceposted by Marc Maso on
Dear srs, I'm doing a convention center in Arabia Saudi and we justify the LPD of the baseline model as this way:
1) We have chosen the Basic Power Allow ASHRAE (Table G3.7)
Ratio Windows/Wall in baseline model Table G1.1.1-1
NC-v4.1 EAp2:Minimum Energy Performanceposted by Marc Maso on
Dear Srs, I hace a question about the ratio windows/walls in leed v4.1. Is for a building with two differents uses: 3.117 m2 of office and 13.472m2 of warehouse.
ASHRAE 90.1-2016 Appendix G - Baseline Building Vertical Fenestration
NC-v4.1 EAp2:Minimum Energy Performanceposted by Mark Terpstra on
Under ASHRAE 90.1-2010, if the fenestration area was less than 40%, the baseline had to match the proposed model for fenestration area.
Natural Ventilation Modelling and Credit for savings
NC-v4.1 EAp2:Minimum Energy Performanceposted by Luis Andrade on
Hi all,
Chilled Water for Process Cooling
NC-v4.1 EAp2:Minimum Energy Performanceposted by Antonio Cajas on
Hello everyone,
Offsite Renewables contributing to the energy model
NC-v4.1 EAp2:Minimum Energy Performanceposted by Dave Hubka on
Looks like we might begin to be able to claim offsite renewable energy systems within the energy modeling points.
Lighting Power Density in LEED v4.1 MEPC Calculator
NC-v4.1 EAp2:Minimum Energy Performanceposted by Gopinath Vasu on
Hi,
I have a question in LEED v4.1 Minimum Energy Performance Calculator.
ASHRAE 90.1 Space by Space Method - Office, Enclosed or Open Plan
NC-v4.1 EAp2:Minimum Energy Performanceposted by Chenlu Li on
Hi all,