Heat recovery HVAC
NC-v4.1 EAp2:Minimum Energy Performanceposted by Josef Andersen on
Hi!
We are currently discussing a design solutions for the HVAC in a project that should fulfill LEED requirements.
Ecology Unit in Mechanical Design
NC-v4.1 EAp2:Minimum Energy Performanceposted by Mu'ath Ad on
Hi, I am working as an architect and noticed in the current project (design is done and construction is going on) there was an Ecology unit provided by the mechanical designer, to clean the air (in
Fuel type for system-5 Packaged system with reheat
NC-v4.1 EAp2:Minimum Energy Performanceposted by John on
Hi Folks,
LEED point adjustment when ASHRAE 90.1-2019 is used as baseline
NC-v4.1 EAp2:Minimum Energy Performanceposted by elvin ruya on
Is there a direct correlation for LEED points when ASHRAE 90.1-2019 baseline is used instead of 2016?
Preheat coil requirement in baseline
NC-v4.1 EAp2:Minimum Energy Performanceposted by Samer Hassanie on
Hi,
It is not clear from G3.1.3.19 where the preheat coil should be placed.
Is it upstream or downstream the economizer and the heat exchanger?
Using BPFs from ASHRAE 90.1-2022 instead of 90.1-2016
NC-v4.1 EAp2:Minimum Energy Performanceposted by Mark Benson on
In the November 2023 issue of ASHRAE Journal, members of the 90.1 committee stated that 60% of the BPFs in ASHRAE 90.1-2022 have become less stringent than those in 2019 and some are even
Desiccant Wheel Modeling for Baseline case
NC-v4.1 EAp2:Minimum Energy Performanceposted by John on
I am working on a model which has Desiccant wheel in design case. Do we need to model desiccant wheel in baseline case as well?
Baseline HVAC, Non-regulated loads and Exceptional Calculation Method for V4.1
NC-v4.1 EAp2:Minimum Energy Performanceposted by on
A 156,000 SF pharmaceutical production facility wants to pursue LEED v4.1. Building breakdown as follows:
EAP2 - air tightness test
NC-v4.1 EAp2:Minimum Energy Performanceposted by Hafsa BOUCHFER on
Hello,
PV and Battery
NC-v4.1 EAp2:Minimum Energy Performanceposted by Kristin Hernandez on
I am working on a new construction project in California that required PV and battery per Title 24. Does this need to be accounted for in the energy model?