Forum quick links
Exemplary performance threshold under v4.1?
NC-v4.1 SSc4:Rainwater Managementposted by Casey Cullen-Woods on
Is anyone able to locate if there is a revised threshold for exemplary performance under v4.1 of this credit? My particular project is a non zero lot line
Option 2 Natural land cover conditions
NC-v4.1 SSc4:Rainwater Managementposted by Allen Cornett on
With the "retain on site" verbiage is there no longer an option to retain off-site? I have a project in a development that previous buildings have met the LEED 2009 stormwater&
Help! My undeveloped condition is a lake
NC-v4.1 SSc4:Rainwater Managementposted by Kristian Kicinski on
My project site is located in Seattle WA on a parcel of land created in 1916 when the level of Lake Washington was lowered 9 feet.
Underground infiltaration system as LID practice?
NC-v4.1 SSc4:Rainwater Managementposted by Barbara Beckmann on
For our project a underground infiltration system is planned. Now we are wondering whether a underground infiltaration system counts as a LID practice?
Requirement to treat run-off from pollution generating hard surfaces with LID
NC-v4.1 SSc4:Rainwater Managementposted by Kavita on
Can anyone please confirm if the LEEDv4.1 version of this credit requires to treat run-off from pollution generating hard surfaces with LID?
Pervious Landscaping as an LID
NC-v4.1 SSc4:Rainwater Managementposted by David Nanstad on
Does pervious landscaping (grasses and trees) count toward LID area that retains water on site in accordance with the Rainfall Events Calculator Strategies tab?
Is sedimentation filtration required for LID?
NC-v4.1 SSc4:Rainwater Managementposted by Garrett Ferguson on
Is sedimentation filtration required for LID for this credit?
Play area excluded from calculations?
NC-v4.1 SSc4:Rainwater Managementposted by Maddie Spinski on
We are building an early childhood education center next to the existing elementary school.
Does "Healthcare" refer to HC-v4.1?
NC-v4.1 SSc4:Rainwater Managementposted by Deb Favaretto on
In both LEED BD+C: New Construction v4.1 and LEED BD+C: Healthcare v4.1, under Requirements in the credit language, USGBC uses the title text: "Percentile of Rainfall Events (1-3 points except Heal
V4.1 credit for v4 project NC-v4.1 SSc4 - Rainwater Management
NC-v4.1 SSc4:Rainwater Managementposted by Ryan Harrington on
If my project is v4 and choose to use the V4.1 path for rainwater management, does the new point scoring also take effect? Basically my project has a meet the 95th percentile under v4 but if I