Are all project parking spaces to be included in the count for an Addition, or just the new spaces designed for the Addition?
NC-v4.1 LTc8:Electric Vehiclesposted by Mollie O'Rourke on
We have a project with a 4-story horizontal addition being added (it is actually a healthcare facility, but there are not currently any Q/A's in the HC Forum). Being helathcare, there is a la
Project with no parking
NC-v4.1 LTc8:Electric Vehiclesposted by Summer Gorder on
Can you still earn this credit with a project with no parking?
electric vehicles and reduced parking footprint?
NC-v4.1 LTc8:Electric Vehiclesposted by Craig Flandermeyer on
Is there a way in v4.1 to use these two credits in tandem? V4 has some guidance that increases percentages if both are used. Curious if anyone has attempted both.
Electric Vehicle -required project documentation
NC-v4.1 LTc8:Electric Vehiclesposted by Michelle DeLora on
I have a client asking me about Option 2 - which is ESVE ready for 10% of parking. In the online summary of the credit it does not go into the required uploads.
Signage for EV spaces
NC-v4.1 LTc8:Electric Vehiclesposted by Amanda Polematidis on
For those of you who completed the credit, would one sign for an area with EV charging stations suffice, or does each charging station need a sign?
Option 1: 2% or 5%, Option 2: 6% or 10%?
NC-v4.1 LTc8:Electric Vehiclesposted by Timothy Ian Middleton on
Thanks to LEED User I just discovered the latest version of NC4.1_LTc8 requires 5% of spaces to comply with Electric Vehicle Charging Requirements, instead of 2%.
Level 1 EV chargers - any credit for extensive installations vs a few Level 2's?
NC-v4.1 LTc8:Electric Vehiclesposted by Pooja Sannamani on
Does anyone have any experience in getting credit for more Level 1 chargers? Increasing having clients question whether Level 2 is the right approach for mass rollout due to electrical infras
Existing EV Chargers Serving Project
NC-v4.1 LTc8:Electric Vehiclesposted by Kelli Kimura on
Hi all,
EV spaces for residential portion?
NC-v4.1 LTc8:Electric Vehiclesposted by MARLOES REININK on
We have a mixed-use project (office, hotel, & residential apartments). With this credit now specific to EV spaces only, how are the residential occupant spaces addressed?
EV charging for spillover parking
NC-v4.1 LTc8:Electric Vehiclesposted by Deborah Lucking on
Our project has allocated areas for spillover parking (used a few times a year) in ones and twos around the site, accessible from an alley. much like on-street parking.